![ABB NGC8206 User Manual Download Page 183](http://html.mh-extra.com/html/abb/ngc8206/ngc8206_user-manual_4215183.webp)
2101510 Rev. AG
Page 5–31
4)
Using the Lithium Battery Status
instructions, verify the battery status is ok before
proceeding.
5)
Disconnect or remove the power from the NGC unit externally, or remove the J1
connector from the termination panel.
As with all the electronic components, caution should be
used when handling boards. Static electricity can potentially
damage the board components, voiding any warranty.
6)
Following the instructions detailed previously in the section,
, remove the panel and unplug the cable. Reaching into the
enclosure, unplug the analytical processor to the termination panel cable from
the analytical processor assembly (see
7)
Using the replacement cable, insert it into the enclosure, and plug into the
power/communication connector, J1. Connect the cable to the back of the
termination panel J12 connector (see
8)
Reinstall the termination panel.
Note that the termination panel to digital controller ribbon
cable pin 1 wire is not red. On the digital controller board,
the red edge (pin 1) of the cable should plug onto pin 50, the
right side of the plug. The plug is keyed; do not force plug
into connector.
9)
Once the unit is reassembled, apply power to the NGC (Step 6).
To return the assembly to Totalflow service for warranty or
repair, please contact Totalflow customer service for an RA
number.
10)
Reinstall the rear end cap.
Note that since power was removed from this unit, the NGC
will perform start-up diagnostics and stabilize. If the user has
disabled the start-up diagnostics, they should be enabled
and power cycled to the unit. If the power has been withheld
from the unit for an unknown or lengthy period of time, a
complete start-up should be performed.
For more information on enabling the diagnostics in PCCU,
click
Diagnostics
and then
Help
.