Page 3–10
2101510 Rev. AG
Figure 3-7 ENC82S–Enclosure Installation
Figure 3-8 ENC82S–Enclosure Mounting Hardware
4)
Move channel spring nut into position so that the bolt will screw into the nut.
Screw the bolt into the nut. Do not tighten.
5)
Repeat for all other corners.
20.5" O.C.
19.00"
53.00"
9/16 X 1 1/4 Slotted Holes
30.38"
13.25"
22.50"
17.25"
22.63"
67.51"
24.00"
(4) Holes for attaching
Bottle Rack Option
Existing
Channel Tubing
Spring Nut
(4 places)
Screw, Lock
Washer &
Washer
(4 places)
Stand