![ABB NGC8206 User Manual Download Page 74](http://html.mh-extra.com/html/abb/ngc8206/ngc8206_user-manual_4215074.webp)
Page 3–14
2101510 Rev. AG
3.8 Optional Support Leg Kit Installation
If the installation includes a pipe-mounted environmental
enclosure and requires an optional support leg, follow these
instructions. Otherwise, continue to the next applicable set of
instructions.
3.8.1
Materials
•
2 ea. ½-13 x 1 ¼ SST bolt
•
2 ea. ½ SST flat washer
•
2 ea. ½” SST split washer
•
1 ea. pre-assembled adjustable height support leg
Must use with pipe-mounting kit.
3.8.2
Instructions
1)
Set the support leg underneath the front or rear (or both if using 2 kits) of
pipe mounted enclosure, oriented so that the leg brace is horizontal with
the front of the enclosure (see
2)
Place split washer, then flat washer on one of the 1 ¼” bolts.
3)
Insert the bolt through the hole located in the angle iron into the outermost corner
of the enclosure. Move channel nut into position so that the bolt will screw into
the nut.
Figure 3-14 ENC82L–Optional support leg Overview
4)
Screw bolt into nut, but leave loose for later adjustment. Repeat for other corner.
5)
If installing two support legs, repeat for other angle iron. Final tightening of bolts
may be done after support leg(s) are in desired positioned on a flat stable
surface.
(31.00)
22.75
TO
37.00