30 Electrical installation
General cabling instructions
•
Arrange the bus cables as far away from the motor cables as
possible.
•
Avoid parallel runs.
•
Use bushings at cable entries.
Connecting the adapter module to the Ethernet
POWERLINK network
1. Connect the network cables to the two RJ-45 connectors (X1
and X2) on the adapter module.
Connect the cable from the master to the left port (X1).
2. In the line topology, if there are more slave devices in the same
line, connect the next slave device to the right port (X2).
3. If there is a redundant ring, connect the right port (X2) of the
last slave device to the second port of the master.
The figure below illustrates the cable connections.
Adapter
module
Adapter
module
Adapter
module
Ethernet
POWERLINK
master
X2
X1
X1 X2
X1 X2
X1 X2
Summary of Contents for FEPL-02 Ethernet POWERLINK
Page 4: ......
Page 10: ...10 Table of contents ...
Page 20: ...20 About the manual ...
Page 28: ...28 Mechanical installation ...
Page 63: ...Start up 63 2 To add the adapter module right click the IF3 list entry and then click Insert ...
Page 69: ...Start up 69 3 In the Project transfer dialog box click OK 4 Wait for the transfer to finish ...
Page 70: ...70 Start up When the transfer is finished the PLC starts up in the RUN mode ...
Page 90: ...90 Communication profiles ...
Page 100: ...100 Communication protocol ...
Page 104: ...104 Diagnostics ...
Page 108: ...108 Technical data ...