AC busbar joints between the COU/TEU and LSU
(14 MVA).
Air-to-air heat exchanger (type LT-5-5165-UL)
Tools for installing an air-to-air heat exchanger
Correct and incorrect cable installation
Air-to-air heat exchangers (type LT-5-5165-UL)
Tools for removing an air-to-air heat exchanger
Installation example of transformers in an air-to-air
heat exchanger
Connect wires to terminal block
Tools required to fasten the pressure relief vent
to the roof
Installation example of pressure relief vents
Attach sealing tape to the joining crossbar (1)
Recommended ceiling and wall fixings
Grounding the input side (A) and output side (B)
of the drive system
System ground connection (1) in a 600 mm TEU
Cable tray and cable ducts in an LSU (A =
front)
Arc Guard System™ in an optional roof extension
box (REB)