Operation
Information!
Place the bucket only with minimum pressure on the ground as you remove
the pins. The higher the pressure on the ground, the higher the resistance and
the more difficult it is to remove the pins.
Connection
☞
Remove the covers on connections
1
and
2
on the
boom and the Powertilt unit
☞
The following connections are possible:
•3rd control circuit with quick-connect coupling
•Two different connection sizes each
☞
Connection of line between boom
1
and connection
1
on the Powertilt unit
☞
Connection of line between boom
2
and connection
2
on the Powertilt unit
Route the hydraulic line through the duct and fasten it with a clamp.
Information!
In order to avoid possible damage to the lines, check the Powertilt unit in all
positions before putting it into operation.
Fig. 231: Connection (left)
1
1
Fig. 232: Connection (right)
2
2
Содержание 2503
Страница 12: ...I 10 OM 25 3503 us Edition 4 1 Ba2503_3503us4_0SIX fm Index...
Страница 40: ...1 28 OM 25 3503 us Edition 4 1 2503_3503b110 fm Introduction...
Страница 182: ...4 8 OM 25 3503 us Edition 4 1 2503_3503b410 fm Malfunctions...
Страница 230: ...5 48 OM 25 3503 us Edition 4 1 2503_3503b550 fm Wartung...
Страница 250: ...6 20 OM 25 3503 us Edition 4 1 2503_3503b610 fm Technical datac 2503 3503 long short stick...
Страница 251: ...OM 25 3503 us Edition 4 1 2503_3503b610 fm 6 21 Technical datac 3503 long short stick VDS 3503 long short stick Vario...
Страница 252: ...6 22 OM 25 3503 us Edition 4 1 2503_3503b610 fm Technical datac...