55
Installing the burner
4x
F
G
C
D
E
B
A
1.
Install the burner and tighten screws
G
diagonally with 8.5 Nm.
2.
Fit gas supply pipe
F
with a new
gasket.
3.
Check the gas connections for tight-
ness.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5773 216 GB
Service
Содержание Vitodens 222-F B2TA series
Страница 12: ...12 2 5 1 4 2x 3 Installing the boiler Removing the front panels 5773 216 GB...
Страница 13: ...13 1 2 SW17 Installing the boiler Siting and levelling the boiler 5773 216 GB Installation...
Страница 19: ...19 2x 4x 4 3 5 2 1 Installing the boiler Opening the control unit casing 5773 216 GB Installation...
Страница 29: ...29 5 4 2 6 2x 3 1 Installing the boiler Closing the control unit casing 5773 216 GB Installation...
Страница 31: ...31 4 1 5 2 2x 3 Installing the boiler Fitting the front panels 5773 216 GB Installation...
Страница 194: ...194 5773 216 GB...
Страница 195: ...195 5773 216 GB...