74
All coding addresses in the table are listed in the "General" group.
Boiler control unit
Vitotronic 200-H
Vitotronic 200-H
Vitocom
LON
LON
LON
Subscriber no. 1,
Code "77:1".
Subscriber no. 10,
Code "77:10".
Subscriber no. 11,
Set
code "77:11".
Subscriber
no. 99.
Control unit is fault
manager,
Code "79:1".
Control unit is not
fault manager,
Code "79:0".
Control unit is not
fault manager,
Code "79:0".
Device is fault
manager.
Control unit transmits
the time,
Code "7b:1".
Control unit receives
the time,
Set
code "81:3".
Control unit receives
the time,
Set
code "81:3".
Device re-
ceives the
time.
Control unit transmits
outside temperature,
Set
code "97:2".
Control unit receives
outside tempera-
ture,
Set
code "97:1".
Control unit receives
outside tempera-
ture,
Set
code "97:1".
—
Viessmann system
number,
Code "98:1".
Viessmann system
number,
Code "98:1".
Viessmann system
number,
Code "98:1".
—
LON subscriber fault
monitoring,
Code "9C:20".
LON subscriber fault
monitoring,
Code "9C:20".
LON subscriber fault
monitoring,
Code "9C:20".
—
Carrying out a LON subscriber check
The subscriber check is used to test
communication with the system devices
connected to the fault manager.
Preconditions:
■ The control unit must be programmed
as
fault manager
(code "79:1" in the
"General"
group).
■ The LON subscriber number must be
programmed in all control units.
■ The LON subscriber list in the fault
manager must be up to date.
Service menu:
1. Press
OK
and
simultaneously for
approx. 4 s.
2.
"Service functions"
3.
"Subscriber check"
4. Select subscriber (e.g. subscriber 10).
5. Start the subscriber check with
"OK"
.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5773 216 GB
Содержание Vitodens 222-F B2TA series
Страница 12: ...12 2 5 1 4 2x 3 Installing the boiler Removing the front panels 5773 216 GB...
Страница 13: ...13 1 2 SW17 Installing the boiler Siting and levelling the boiler 5773 216 GB Installation...
Страница 19: ...19 2x 4x 4 3 5 2 1 Installing the boiler Opening the control unit casing 5773 216 GB Installation...
Страница 29: ...29 5 4 2 6 2x 3 1 Installing the boiler Closing the control unit casing 5773 216 GB Installation...
Страница 31: ...31 4 1 5 2 2x 3 Installing the boiler Fitting the front panels 5773 216 GB Installation...
Страница 194: ...194 5773 216 GB...
Страница 195: ...195 5773 216 GB...