35
Removing the front panels
See page 12
Filling the heating system
Fill water
!
Please note
Unsuitable fill water increases
the level of deposits and corro-
sion and may lead to boiler dam-
age.
■ Flush the heating system thor-
oughly before filling.
■ Only use fill water of potable
quality.
■ An antifreeze additive suitable
for heating systems can be
added to the fill water. The anti-
freeze manufacturer must ver-
ify its suitability.
■ Fill and top-up water with a
water hardness in excess of
the following values must be
softened, e.g. with a small soft-
ening system for heating water.
Total permissible hardness of the fill and top-up water
Total heating
output
Specific system volume (Conversion rate 1 mol/m
3
= 100
ppm)
kW
< 20 l/kW
≥ 20 l/kW to
< 50 l/kW
≥ 50 l/kW
≤ 50
≤ 3.0 mol/m
3
≤ 2.0 mol/m
3
< 0.02 mol/m
3
> 50 to ≤ 200
≤ 2.0 mol/m
3
≤ 1.5 mol/m
3
< 0.02 mol/m
3
> 200 to ≤ 600
≤ 1.5 mol/m
3
≤ 0.02 mol/m
3
< 0.02 mol/m
3
> 600
< 0.02 mol/m
3
< 0.02 mol/m
3
< 0.02 mol/m
3
Commissioning, inspection, maintenance
Further details regarding the individual steps
5773 216 GB
Service
Содержание Vitodens 222-F B2TA series
Страница 12: ...12 2 5 1 4 2x 3 Installing the boiler Removing the front panels 5773 216 GB...
Страница 13: ...13 1 2 SW17 Installing the boiler Siting and levelling the boiler 5773 216 GB Installation...
Страница 19: ...19 2x 4x 4 3 5 2 1 Installing the boiler Opening the control unit casing 5773 216 GB Installation...
Страница 29: ...29 5 4 2 6 2x 3 1 Installing the boiler Closing the control unit casing 5773 216 GB Installation...
Страница 31: ...31 4 1 5 2 2x 3 Installing the boiler Fitting the front panels 5773 216 GB Installation...
Страница 194: ...194 5773 216 GB...
Страница 195: ...195 5773 216 GB...