37
Activating the filling function
Weather-compensated control unit
Constant temperature control unit
Service menu
1. Press
OK
and
å
simultaneously for
approx. 4 s.
2.
"Service functions"
3.
"Filling"
Filling function is enabled.
4. Ending filling function:
Press
OK
or
ä
.
Service menu
1. Press
OK
and
å
simultaneously for
approx. 4 s.
2. Select "
4
" and confirm with
OK
.
"ON"
flashes.
3. Activate the filling function with
OK
.
"bF on"
is shown constantly.
4. Ending filling function:
Press
ä
.
Filling the DHW cylinder on the DHW side
1.
Lever on valve
B
must be in the
"left" position.
2.
Open on-site DHW supply and a
DHW draw-off point.
3.
Once air stops coming out of the
DHW draw-off point, the DHW cylin-
der is completely filled.
Selecting the language - only for weather-compensated control
units
At the commissioning stage, the display
is in German (factory setting).
Extended menu:
1.
å
2.
"Einstellungen"
3.
"Sprache"
4. Select the required language with /
.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5773 216 GB
Service
Содержание Vitodens 222-F B2TA series
Страница 12: ...12 2 5 1 4 2x 3 Installing the boiler Removing the front panels 5773 216 GB...
Страница 13: ...13 1 2 SW17 Installing the boiler Siting and levelling the boiler 5773 216 GB Installation...
Страница 19: ...19 2x 4x 4 3 5 2 1 Installing the boiler Opening the control unit casing 5773 216 GB Installation...
Страница 29: ...29 5 4 2 6 2x 3 1 Installing the boiler Closing the control unit casing 5773 216 GB Installation...
Страница 31: ...31 4 1 5 2 2x 3 Installing the boiler Fitting the front panels 5773 216 GB Installation...
Страница 194: ...194 5773 216 GB...
Страница 195: ...195 5773 216 GB...