
7.5
8
8.1
8.2
8.3
8.4
Preparation for the aileron control
8.5
Installation of top coating 145
8.5.1
8.6
8.7
8.8
9
9.1
9.2
side 149
9.3
Final gluing of half of the right
9.4
9.5
9.6
9.6.1
spar 152
9.7
Содержание 400
Страница 1: ...VELOCE Manufacturing Manual 400...