Reset switch
228
Service Manual TruSystem 7000 Operating Table – 1 764 986 – 10/2016
2. Insert the plug of the reset switch into the socket on the power
board (PB1) (power supply unit) (see circuit diagram on
page 295).
3. Restore the original cable routing.
Reattach the cable attachment along the connection cable
from the reset switch up to power supply unit.
4. Set the cable deflector onto the two screws on the column
base and slide it flush against the power supply unit. Mount the
cable deflector to the power supply unit (2 screws on the top)
and tighten the two screws on the column base.
5. Check and clean the end cap of the reset switch and replace
it if worn or damaged. Insert the end cap on the column pot.
6. Check the cover foil and replace it if damaged. Apply cover
foil to the column pot.
7. Establish the internal power supply, close the column cover
and turn on the operating table (see chapter 10 on page 33).
8. Put on the pad.
TEST
Perform recheck according to IEC 60601-1; perform function test
and final check.
Содержание TruSystem 7000
Страница 1: ...TruSystem 7000 Operating Table Service Manual...
Страница 4: ...Service Manual TruSystem 7000 Operating Table 1 764 986 10 2016...
Страница 10: ...Contents 10 Service Manual TruSystem 7000 Operating Table 1 764 986 10 2016...
Страница 297: ...Circuit Diagram Service Manual TruSystem 7000 Operating Table 1 764 986 10 2016 297...
Страница 298: ...Circuit Diagram 298 Service Manual TruSystem 7000 Operating Table 1 764 986 10 2016...
Страница 300: ...Hydraulics Diagram 300 Service Manual TruSystem 7000 Operating Table 1 764 986 10 2016...
Страница 302: ...Hydraulic Jack Unit 302 Service Manual TruSystem 7000 Operating Table 1 764 986 10 2016...
Страница 304: ...Service Information 304 Service Manual TruSystem 7000 Operating Table 1 764 986 10 2016...
Страница 305: ......