6 Cleaning and maintenance
MIRUS Controller, SW 2.03.02, Additional Information Master (en-GB)
6-9
Exchange UPS battery
The UPS battery must be changed every 24 months.
The following accessory is required (refer to Chapter 6.6):
UPS battery
Torque wrench, adjustable to 0.6 Nm
Carry out the exchange
a. Turn the MIRUS Controller OFF and disconnect it from AC.
b. Open the battery housing.
c. Remove the old battery from housing.
d. Disconnect the old battery from the battery connector.
e. Connect the new battery to the battery connector.
f.
Reinsert the new battery and ensure it is properly placed in the battery housing.
g. Close the battery housing (torque 0.6 Nm).
h. Perform a Safety function test (refer to Chapter 6.2.7).
i.
Ensure proper disposal of the old battery.
Содержание Mirus MC DES
Страница 1: ...Additional Information MIRUSTM Controller Software version 2 03 02 Hardware version 2 n...
Страница 28: ...1 Introduction 1 22 MIRUS Controller SW 2 03 02 Additional Information Master en GB Notes...
Страница 48: ...3 General description 3 8 MIRUS Controller SW 2 03 02 Additional Information Master en GB Notes...
Страница 78: ...5 Operation 5 18 MIRUS Controller SW 2 03 02 Additional Information Master en GB Notes...
Страница 92: ...6 Cleaning and maintenance 6 14 MIRUS Controller SW 2 03 02 Additional Information Master en GB Notes...
Страница 118: ...7 Alarms and messages 7 26 MIRUS Controller SW 2 03 02 Additional Information Master en GB Notes...