4 Preparation
MIRUS Controller, SW 2.03.02, Additional Information Master (en-GB)
4-11
4.6 Self-test
The MIRUS Controller software contains self-test capabilities that verify whether the software,
the pneumatic and electrical components, the MIRUS Reflector and the gas monitor work
properly.
These self-tests are (in sequential order)
•
Power up test
•
System test
The Power up test of the MIRUS Controller
starts as soon as the device is connected to a
line supply and Confirm button has been
pressed.
During Power up test all safety relevant
components will be tested.
In case of a malfunction, the MIRUS
Controller displays a message on the screen
after the Power up test is complete.
If the MIRUS Reflector is hooked up, and
there is no malfunction detected during Power
up test, the MIRUS Controller directly starts
the System test without any user activity.
HW 2.n
SW 2.03.02
One moment please…
HW 2.n
SW 2.03.02
Sorry. A problem has been detected.
The device cannot be operated.
To turn off device please confirm.
Содержание Mirus MC DES
Страница 1: ...Additional Information MIRUSTM Controller Software version 2 03 02 Hardware version 2 n...
Страница 28: ...1 Introduction 1 22 MIRUS Controller SW 2 03 02 Additional Information Master en GB Notes...
Страница 48: ...3 General description 3 8 MIRUS Controller SW 2 03 02 Additional Information Master en GB Notes...
Страница 78: ...5 Operation 5 18 MIRUS Controller SW 2 03 02 Additional Information Master en GB Notes...
Страница 92: ...6 Cleaning and maintenance 6 14 MIRUS Controller SW 2 03 02 Additional Information Master en GB Notes...
Страница 118: ...7 Alarms and messages 7 26 MIRUS Controller SW 2 03 02 Additional Information Master en GB Notes...