
76
OPERATION
Machine Operation
Operating the Boom Swing
a
To swing left:
Press the left side of the pedal.
e
To swing right:
Press the right side of the pedal.
Operating the Dozer Blade
a
To lower the dozer blade:
Tilt the lever forward.
e
To raise the dozer blade:
Tilt the lever backward.
Operating the Arm
a
To contract the arm:
Tilt the left operating lever backward.
e
To extend the arm:
Tilt the left operating lever forward.
Operating the Bucket
a
To dig:
Tilt the right operating lever to the left.
e
To dump:
Tilt the right operating lever to the right.
Operating the Intermediate Boom
a
To lower the intermediate boom:
Press the selector button and step on the
right side of the pedal.
e
To raise the intermediate boom:
Press the selector button and step on the
left side of the pedal.
E4D023
C4D008
E4D024
E4D026
L3D012
Содержание TB175
Страница 7: ...4...
Страница 9: ...6...
Страница 157: ...154...
Страница 158: ...155 SPECIFICATIONS Main Specifications 156 Machine Dimensions 158 Operating Range 162 Lifting Capacities 167...
Страница 160: ...157 MEMO...
Страница 161: ...158 SPECIFICATIONS Machine Dimensions Mono Boom L3K001 N L M D Q P J H K C F G A S E B R T U W V...
Страница 163: ...160 SPECIFICATIONS Machine Dimensions 2 Piece Boom L3K001 N L M D Q P J H K C F G A S E B R T U W V...
Страница 165: ...162 SPECIFICATIONS Operating Range Mono Boom L3K0021 J K H B A E F C D G...
Страница 167: ...164 SPECIFICATIONS Operating Range 2 Piece Boom L3L032 J E F G C D K H B A...
Страница 169: ...166 MEMO...
Страница 183: ...180...
Страница 223: ...220...
Страница 224: ...221 INDEX...