
135
MAINTENANCE
When Required
3. Operate the cylinder, line up pin hole (B)
in the bucket with the pin hole in the link
arm (6), and install the pin (2).
4. Line up the turn prevention holes, install
the bolt (1), and the nuts.
Be sure to leave a gap of about 0.5 ~ 1
mm (0.02 ~ 0.04 in.) between the nut and
bucket bush, or the nut will come loose.
5. Adjust the gap between the bucket and
the arm. Refer to page 132.
6. Slide the O-ring (4).
E4G055
0.5~1mm
1
E4G056
4
E4G057
3
Replacing the pin seal
1. Set the pin seal (3) in the direction shown
on the diagram above.
2. Use a mallet to slowly press the pin seal
in. Be careful not to damage the seal.
Содержание TB175
Страница 7: ...4...
Страница 9: ...6...
Страница 157: ...154...
Страница 158: ...155 SPECIFICATIONS Main Specifications 156 Machine Dimensions 158 Operating Range 162 Lifting Capacities 167...
Страница 160: ...157 MEMO...
Страница 161: ...158 SPECIFICATIONS Machine Dimensions Mono Boom L3K001 N L M D Q P J H K C F G A S E B R T U W V...
Страница 163: ...160 SPECIFICATIONS Machine Dimensions 2 Piece Boom L3K001 N L M D Q P J H K C F G A S E B R T U W V...
Страница 165: ...162 SPECIFICATIONS Operating Range Mono Boom L3K0021 J K H B A E F C D G...
Страница 167: ...164 SPECIFICATIONS Operating Range 2 Piece Boom L3L032 J E F G C D K H B A...
Страница 169: ...166 MEMO...
Страница 183: ...180...
Страница 223: ...220...
Страница 224: ...221 INDEX...