139
MAINTENANCE
When Required
Installation
1. Engage the crawlers with the left and right
sprockets.
2. Set the left and right crawlers on the idlers.
3. Start the engine.
4. Press the travel speed switch once and
set it to the 2nd speed side. The left and
right crawlers are tightened
simultaneously.
5. Check that the crawlers are properly
tightened. Standard value (A).
Refer to page 115 “Inspecting the Crawler
Tension”.
9. Slowly lower the dozer blade side of the
machine body, by the dozer blade lever.
(Do not start the engine.)
10. Ground the crawlers and lower the
machine body so that the crawler slack
is maximum.
11. When the crawlers come away from the
idlers, slide the crawlers to the outside
and remove them.
12. Disengage the crawlers and sprockets,
then remove the crawlers from the
crawler frames.
Содержание TB175
Страница 7: ...4...
Страница 9: ...6...
Страница 157: ...154...
Страница 158: ...155 SPECIFICATIONS Main Specifications 156 Machine Dimensions 158 Operating Range 162 Lifting Capacities 167...
Страница 160: ...157 MEMO...
Страница 161: ...158 SPECIFICATIONS Machine Dimensions Mono Boom L3K001 N L M D Q P J H K C F G A S E B R T U W V...
Страница 163: ...160 SPECIFICATIONS Machine Dimensions 2 Piece Boom L3K001 N L M D Q P J H K C F G A S E B R T U W V...
Страница 165: ...162 SPECIFICATIONS Operating Range Mono Boom L3K0021 J K H B A E F C D G...
Страница 167: ...164 SPECIFICATIONS Operating Range 2 Piece Boom L3L032 J E F G C D K H B A...
Страница 169: ...166 MEMO...
Страница 183: ...180...
Страница 223: ...220...
Страница 224: ...221 INDEX...