background image

 

 

 

 

 

 

Schedule options: 

 

 

Start Date

 – The starting date when the backup will be done. This usually defaults to the 

current date. Click the “…” button. A calendar will be displayed. To change the Start Date, 
select a new date in the calendar. 

 

Run At 

– The preferred time to run the backup. To change the Run At time, click the pull-

down arrow then select the preferred time. 

 

Expired Date 

– The ending date for the backup. To change the Expired Date, click the “…” 

button then select in the calendar the preferred last date of backup. 

 

How often to take a backup? (Days/Round)

 – The number of days that will pass before a 

differential backup will be done. 

 

A cycle begins with a full backup and follows rounds of differential backup

 – Enter the 

number of differential backups that will be made before starting a new full backup. 

 

How many recent cycles of backups are preserved?

 – Enter a number which is the total 

number of backup cycles that will be preserved. A backup cycle starts with a full backup and 
ends with the last differential backup before the next full backup. When the number of cycles 
in a schedule has been reached and a new cycle is started, the oldest backup cycle will be 
automatically removed. 

 

Preview Schedule 

– Click this button to update the calendar schedule. 

 

 

Full Backup

 – archival backup; all files are copied to a backup storage device 

 

Differential Backup

 – backup only the data files that have been modified since the 

last full backup 

 

 

Click “Save” to update the schedule settings. Then click “Enable” to activate the backup schedule. 

The History tab shows a log or list of operations that have happened in proBackup such as backup or 
restore operation. To delete an entry in the history list, select the item in the list and click “Delete”. 

Содержание TRITON 16Ni

Страница 1: ...SurfRAID TRITON 16Ni User s Guide Revision 1 1...

Страница 2: ...verview 2 1 Packaging Shipment and Delivery 2 2 Unpacking the NAS System 2 3 Identifying Parts of the SR TRITON16Ni System 2 3 1 Front View 2 3 2 Rear View Chapter 3 Getting Started with the SR TRITON...

Страница 3: ...ume Set Migration 5 3 5 Check Volume Set 5 3 6 Schedule Volume Check 5 3 7 Stop Volume Check 5 4 Physical Drive 5 4 1 Create Pass Through Disk 5 4 2 Modify a Pass Through Disk 5 4 3 Delete Pass Throug...

Страница 4: ...ating System Management GUI Chapter 8 SR TRITON16Ni proNAS Manager 8 1 Volume Manager 8 1 1 Volume Group Management 8 1 1 1 Create the proNASVG Volume Group 8 1 1 2 Creating another Volume Group 8 1 1...

Страница 5: ...4 Share Manager 8 4 1 Share Management 8 4 1 1 Creating a New Share 8 4 1 2 Applying ACL 8 4 1 3 Modifying a Share 8 4 1 4 Deleting a Share 8 4 2 Properties Setting 8 4 2 1 Steps to Make a Share Folde...

Страница 6: ...0 1 Introduction to SR TRITON16Ni proBackup Utility 10 2 Administrator Logon 10 3 Create Backup Plan 10 4 Restore Backup 10 5 Account Detail Chapter 11 proNAS HA Optional Feature 11 1 Introduction to...

Страница 7: ...nual uses section numbering for every topic being discussed for easy and convenient way of finding information in accordance with the user s needs The following icons are being used for some details a...

Страница 8: ...there is no guarantee that interference will not occur in a particular installation If this equipment does cause interference to radio or television equipment reception which can be determined by tur...

Страница 9: ...removed from the enclosure Outlets must be accessible to the equipment All external connections should be made using shielded cables and as much as possible should not be performed by bare hand Using...

Страница 10: ...xible and expandable application and together with the proNAS management solution proNAS High Availability and proBackup client backup solution provide businesses with the most flexible scalable secur...

Страница 11: ...line capacity expansion within the enclosure Support spin down drives for power saving MAID and disk drive power cycle Scheduled volume check data correctness for RAID 3 5 6 64 bit Linux based embedde...

Страница 12: ...ID connection to a Host System volume created from enclosure is used by other host system One 1 4X SAS Expansion port for JBOD connection up to 6 SAS JBOD enclosures max 112 disks using SR TRITON16JS3...

Страница 13: ...nicode support Multi node Management GUI proNAS Data and Configuration Backup Central Management Networking Supports NIC Trunking types Fault Tolerant Load Balance Fault Tolerant and Load Balance and...

Страница 14: ...Replication Requires two SR TRITON16Ni subsystems Duplication Scheduling Rsync Replication proBackup backup from client to NAS and Symantec Backup Exec RALUS agent for Linux Support CDP Server Option...

Страница 15: ...pes should be used Most operating systems today support concurrent disk I O operations across multiple drives However in order to maximize throughput for the disk subsystem the I O load must be balanc...

Страница 16: ...n there is less performance degradation during drive failure than in RAID 5 arrays RAID 3 sector stripes data across groups of drives but one drive in the group is dedicated for storing parity informa...

Страница 17: ...tween the increased data availability inherent in RAID 1 and RAID 5 and the increased read performance inherent in disk striping RAID 0 These arrays are sometimes referred to as RAID 0 1 or RAID 1 0 a...

Страница 18: ...mance RAID 5 combines efficient fault tolerant data storage with good performance characteristics However write performance and performance during drive failure is slower than with RAID 1 Rebuild oper...

Страница 19: ...tion of RAID levels 0 and 1 This level provides striping and redundancy through mirroring RAID 10 requires the use of an even number of disk drives to achieve data protection while RAID 1E Enhanced Mi...

Страница 20: ...Set then the capacity of the smallest disk will become the effective capacity of all the disks in the Raid Set 1 4 2 Volume Set A Volume Set is seen by the host system as a single logical device It is...

Страница 21: ...ve Support The RAID subsystem has built in protection circuit to support the replacement of SATA II hard disk drives without having to shut down or reboot the system The removable hard drive tray can...

Страница 22: ...re you purchased the subsystem for further instructions 2 2 Unpacking the NAS System The package contains the following items SR TRITON16Ni NAS SAS SATA RAID System chassis Two 2 power cords Three 3 C...

Страница 23: ...ction HDD Status LED Green LED indicates power is on and hard drive status is good for this slot If hard drive slot or the hard drive has failed the LED is orange HDD Access LED This LED will blink bl...

Страница 24: ...the previous menu NOTE This button can also be used to reset the alarm beeper For example if one power supply fails pressing this button will mute the beeper 6 Environment Status LEDs 7 Disk Tray Par...

Страница 25: ...PSU 2 are located at the rear of the SR TRITON16Ni system If the power supply fails to function the Power Fail LED will turn red and an alarm will sound An error message will also appear on the LCD sc...

Страница 26: ...tions and Com2 is for UPS serial cable 11 SAS Expansion Port Use this to connect SAS JBOD expansion enclosures to expand the storage capacity of the SR TRITON16Ni Up to 6 SR TRITON16JS3 JBOD enclosure...

Страница 27: ...er environments Typically this has already been done by Partners Data Systems along with the data RAID volumes and can be skipped to the next step After initially setting up the internal RAID controll...

Страница 28: ...eed to be shutdown via the proNAS management interface first then expansion chassis power switches 1 Plug in the 2 power cords into the AC power input sockets located at the rear of the SR TRITON16Ni...

Страница 29: ...ation paperwork on top of your storage system All disk drives will be labeled with unit of chassis and drive slot Only the cold shelf spare labeled disk drives should be left out of the storage system...

Страница 30: ...chassis and insert the other end to the SAS In port of the JBOD enclosure JBOD 1 2 If there are additional JBOD enclosures to be connected connect other 1m external SAS cable from the SAS Expansion Po...

Страница 31: ...nto place 4 Ensure all the external SAS cabling is fully seated and locked Only 1 meter external SAS cabling should be used to connect JBOD expansion subsystems 5 Power on all the JBOD subsystems star...

Страница 32: ...han one method at the same time The R Link Ethernet port will be needed to support remote notification and is strongly recommended 4 1 Configuration through VT100 Terminal Configuring through a termin...

Страница 33: ...4 The default setting of the monitor port is 115200 baud rate 8 data bit non parity 1 stop bit and no flow control 5 Click disconnect button...

Страница 34: ...pen Properties 7 Open the Settings Tab 8 Configure the settings as follows Function arrow and ctrl keys act as Terminal Keys Backspace key sends Crtl H Emulation VT100 Telnet terminal ID VT100 Back sc...

Страница 35: ...ubsystem and Terminal together Press X key to display the internal RAID array Monitor Utility screen on your VT100 Terminal 10 The Main Menu will appear Keyboard Function Key Definitions A key to move...

Страница 36: ...ws user to set or clear the RAID subsystem s password protection feature Once the password has been set the user can only monitor and configure the RAID subsystem by providing the correct password The...

Страница 37: ...sts of all physical disks installed Raid Set Functions Create a customized Raid Set Volume Set Functions Create a customized Volume Set Physical Drive Functions View individual disk information Raid S...

Страница 38: ...t password is set to 00000000 Function Key Definitions The four function keys at the top of the front panel perform the following functions Parts Function Up and Down Arrow buttons Use the Up or Down...

Страница 39: ...Diagram The following menu diagram is a summary of the various configurations and setting functions that can be accessed through terminal The LCD panel menus also have similar functions except Update...

Страница 40: ......

Страница 41: ......

Страница 42: ......

Страница 43: ......

Страница 44: ...rom remote machine and enter in the address bar http IPAddress The internal RAID manager IP address is displayed on the front panel LCD IMPORTANT The R Link default IP Addressis set to DHCP otherwise...

Страница 45: ...ns Create customized and edit existing Raid Sets Volume Set Functions Create customized Volume Sets and allow modification of parameters of existing Volume Sets parameter Physical Drive Create pass th...

Страница 46: ...RAID Set when creating RAID Sets If the Volume Set size is over 2TB an option Greater Two TB Volume Support will be automatically provided in the screen as shown in the example below There are three o...

Страница 47: ...on and click on the Submit button in the Quick Create screen The Raid Set and Volume Set will start to initialize You can use RaidSet Hierarchy feature to view the Volume Set information Refer to Sect...

Страница 48: ...luded in Raid Set to be created Enter the preferred Raid Set Name 1 to 16 alphanumeric characters to define a unique identifier for the Raid Set The default Raid Set name will always appear as Raid Se...

Страница 49: ...lick on the Submit button to process with deletion NOTE You cannot delete a Raid Set containing a Raid 30 50 60 Volume Set You must delete the Raid 30 50 60 Volume Set first 5 2 3 Expand RAID Set Use...

Страница 50: ...tus is displayed in the Raid Set status area of the Raid Set information Migrating status is also displayed in the Volume Set status area of the Volume Set Information for all Volume Sets under the Ra...

Страница 51: ...fline in the Select column Click on the Confirm The Operation and then click on the Submit button to offline the selected Raid Set After all the status leds for the drive slots turn red is ok to remov...

Страница 52: ...nd the NAS system is powered off and one disk drive is removed or has failed in power off state and when the NAS system is powered on the Raid Set State will change to Incomplete The Volume Set will n...

Страница 53: ...nt to activate in the Select column Click on the Submit button to activate the Raid Set The Volume Set s associated with the Raid Set will become accessible in Degraded mode NOTE The Activate Raid Set...

Страница 54: ...elete Hot Spare Select the target Hot Sparedisk s to delete by clicking on the appropriate check box Click on the Confirm The Operation and click on the Submit button in the screen to delete the hot s...

Страница 55: ...5 2 8 Rescue Raid Set If you need to recover a missing Raid Set using the Rescue Raid Set function please contact Partners Data System s support engineer for assistance...

Страница 56: ...Create Volume Set The following are the Volume Set features 1 Volume sets of different RAID levels may coexist on the same Raid Set 2 Up to 128 Volume Sets in a Raid Set can be created by the RAID co...

Страница 57: ...e used as Dynamic Disk also can t be used in 512Bytes block service program NOTE For NAS system usage if you want the maximum capacity allowed to be over 2TB and to have a single Volume Set over 2TB s...

Страница 58: ...ould normally remain enabled SAS Port LUN Base LUN SAS Port There are two 3Gbps SAS Host Channels in the RAID subsystem Select the SAS port where to map the LUN Volume Set Options are 0 to map Volume...

Страница 59: ...Raid Sets that you want to include in the creation and then click on the Submit button NOTE The maximum number of Raid Sets supported per RAID controller is 8 the SR TRITON16Ni subsystem contains one...

Страница 60: ...Select The Volume Set To Delete screen will show all available Raid Sets Click on a Raid Set and check the Confirm The Operation option and then click on the Submit button to show all Volume Sets in...

Страница 61: ...Set link 2 Click on from the list the Volume Set you want to modify Click on the Submit button The following screen appears To modify Volume Set attribute values select an attribute item and click on...

Страница 62: ...under that Raid Set The new Volume Set will appear as a new disk device to the proNAS operating system It is not recommended to expand the capacity of a Volume Set already joined to proNAS Volume Gro...

Страница 63: ...m one RAID level to another a Volume Set stripe size changes or when a disk is added to a Raid Set Migrating status is displayed in the Volume Set status area of the RaidSet Hierarchy screen during mi...

Страница 64: ...olume Set Only RAID levels with parity redundant data such as RAID Levels 3 5 6 30 50 and 60 support this function To perform Check Volume Set function 1 Click on the Check Volume Set link 2 Click on...

Страница 65: ...3 Click on Confirm The Operation and click on the Submit button The Checking process will be started The checking percentage can also be viewed by clicking on RaidSet Hierarchy in the Information menu...

Страница 66: ...rm The Operation and click on the Submit button Scheduler Disabled 1Day For Testing 1Week 2Weeks 3Weeks 4Weeks 8Weeks 12Weeks 16Weeks 20Weeks and 24Weeks Check After System Idle No 1 Minute 3 Minutes...

Страница 67: ...5 3 7 Stop Volume Check Use this option to stop current running Check Volume Set process...

Страница 68: ...e and individual Raid Set The disk is available to the host as an individual disk It is typically used on a system where the operating system is on a disk not controlled by the RAID firmware To create...

Страница 69: ...nk The Select The Pass Through Disk For Modification screen appears Click on the Pass Through Disk from the Pass Through drive pool and click on the Submit button to select the drive The Enter Pass Th...

Страница 70: ...rticular enclosure is selected 5 4 5 Identify Selected Drive Use this option to physically locate a selected drive to prevent removing the wrong drive When a disk drive is selected using the Identify...

Страница 71: ...tem allows user to choose the background task priority High 80 Medium 50 Low 25 and Ultra Low 5 to balance between background task process and Volume Set access For high RAID subsystem performance spe...

Страница 72: ...rite Cache Mode The internal RAID controller supports Disk Write Cache Mode options Auto Enabled and Disabled If the RAID subsystem has BBM battery backup module selecting the Auto option will automat...

Страница 73: ...k the Submit button to save the settings NOTE It is not recommended to use the Hdd Power Management with disk drives used by the SR TRITON16Ni subsystem 5 5 3 EtherNet Configuration To set the Etherne...

Страница 74: ...ternal RAID controller Event Notification configuration screen will be shown Set up the desired function and option When an abnormal condition occurs an error message will be emailed to the email reci...

Страница 75: ...address of the host system where SNMP traps will be sent The SNMP Port is set to 162 by default SNMP System Configuration Community Type the SNMP community The default is public 1 sysContact 0 2 sysL...

Страница 76: ...be displayed Select the desired function and configure the necessary option After completing the settings Click on the Confirm The Operation and click on the Submit button to save the configuration 5...

Страница 77: ...r to the main menu and click on the Generate Test Event Link Click on the Confirm The Operation and click on the Submit button Then click on the View Events Mute Beeper to view the test event 5 5 9 Cl...

Страница 78: ...he password enter only the original password in the Enter Original Password box leave both the Enter New Password and Re Enter New Password boxes blank After selecting the Confirm The Operation option...

Страница 79: ...w the Raid Set information click the Raid Set link from the Raid Set Hierarchy screen The Raid Set Information screen appears To view the disk drive information click the Slot link from the Raid Set H...

Страница 80: ...u The Raid Subsystem Information screen appears The Controller Name Firmware Version Serial Number Main Processor CPU Data Instruction Cache size System Memory size speed Current IP Address SAS Addres...

Страница 81: ...changeable When the threshold values are surpassed warning messages will be indicated through the LCD LED and alarm buzzer If you have setup the SMTP SNMP syslog or messenger you will also be notified...

Страница 82: ...em via the proNAS GUI and unplug all power cords 2 Press the push button lock on the top cover of the chassis and pull the top cover handle towards the rear Then remove the top cover 3 Remove the cach...

Страница 83: ...XX refers to the model name and VVVV refers to the firmware version Serial only upgrade see README txt for details XXXX mfgdata VVVV rom Firmware ROM where XXXX refers to the model name and VVVV refer...

Страница 84: ...9 to upgrade the firmware code after which a RAID controller restart will be necessary 1 From the Main Menu scroll down to Raid System Function 2 Choose the Update Firmware The Update The Raid Firmwa...

Страница 85: ...rowse Look in the location where the firmware file was saved Select the firmware file name XXXXXVVV BOOT BIN or XXXXXVVV BIN and click Open 6 Click Send to send the firmware binary file to the RAID co...

Страница 86: ...press enter key to start programming the flash ROM 8 When the Flash programming starts a message will show Start Updating Firmware Please Wait 9 The XXX VVV boot bin upgrade will take 5 10 seconds an...

Страница 87: ...Firmware Has Been Updated Successfully Restarting the internal RAID controller is required for the new firmware to take effect Restarting the internal RAID controller must be performed via the Shutdo...

Страница 88: ...RAID subsystem firmware click the Upgrade Firmware link under System Controls menu The Upgrade The Raid System Firmware Or Boot Rom screen appears 2 Click Browse button Look in the location where the...

Страница 89: ...message will show Firmware Has Been Updated Successfully Restarting the internal RAID controller is required for the new firmware to take effect and must be performed via the Shutdown function in the...

Страница 90: ...uration of volume groups logical volumes volume snapshot and volume replication Account Manager proNAS Local and external account configuration Import large accounts Backup Manager proNAS supports sys...

Страница 91: ...ponents with proNAS Manager This is described in details in Chapter 8 proNAS GUI Manager To configure proNAS you need to Join a disk Volume Set created in internal RAID Manager to the system default v...

Страница 92: ...re the network settings of your client computer to be able to connect to R Link IP address 172 16 0 2 displayed in LCD panel if not yet configured b Open web browser and type http xxx xxx xxx xxx in t...

Страница 93: ...drives to be included in the RAID Set Click Confirm The Operation and click Submit button The RAID Set will be created 3 Create Volume Set a Click Volume Set Functions to expand the menu b Click Creat...

Страница 94: ...umes Sets mapped to internal RAID controller host port 0 will be by the proNAS operating system Volumes Sets mapped to the internal RAID controller host port 1 will not be seen by the proNAS operating...

Страница 95: ...2 16 0 5 subnet 255 255 0 0 The proNAS LAN0 IP address will not be permanent until after the proNAS volume group has been created Apply your desired network IP address only after the proNASVG volume g...

Страница 96: ...language options English Chinese Taiwan Chinese China Japanese Korean German Germany Polish Poland and Russian Russia You can select your preferred language before logon 6 The SR TRITON16Ni proNAS Op...

Страница 97: ...NOTE For security reason it is necessary to change the default admin password To change admin password click the Change Password button and enter the new password...

Страница 98: ...i proNAS subsystem managers The IP Address section lists the each of the SR TRITON16Ni subsystems connected to the network The SR TRITON16Ni proNAS Manager s Multi Node Technology is based on UDP Mult...

Страница 99: ...ders reside on these Logical Volumes The default proNASVG Volume Group cannot be deleted When proNASVG is created the XFS file system is set in each default Logical Volume XFS file system is also set...

Страница 100: ...ew disk remove any disk and reset the VG NOTE If the Disk List in Volume Manager does not show any RAID disk for example dev sda but a Raid Set and Volume Set has been created already it is necessary...

Страница 101: ...Disk s that will be joined to proNASVG from the list of Available Disk s Click OK when done NOTE Unit Size is the Physical Extent or block size used in the Volume Group The VG Unit Size is set to 512M...

Страница 102: ...sage will be displayed Click OK to close the message 8 Wait for about 3 minutes then re login to proNAS management GUI The Volume Manager will show the joined disk as IN_USED and the Volume List will...

Страница 103: ...r If a new Volume Set has already been created the proNAS operating system must be restarted in order to detect the new RAID disk To restart the proNAS operating system select System Manager under pro...

Страница 104: ...3 A confirmation message will appear Select Yes to proceed 4 Click Join New Disk to continue with creating the new Volume Group 5 Check the disk s to be joined to the VG Click OK when done...

Страница 105: ...ill be shown NOTE The new VG has no default Logical Volumes Admin can create new Logical Volumes NOTE The pro NAS supports up to 5 Volume Groups Volume Group is the highest level abstraction used with...

Страница 106: ...the Volume Group all the data will be erased Use the Reset Volume Group function only when necessary and when the data from the VG have been backed up or you do not want to keep the data 1 Select Rese...

Страница 107: ...4 Select Yes from the confirmation message 5 Verify from Volume Group List in Volume Manager that the VG has been removed NOTE The system default Volume Group proNASVG cannot be deleted or reset...

Страница 108: ...ew Volume button 2 The LV Configuration tab will be displayed Enter the Logical Volume name and the volume size in MB You can also enable the Send email when not enough space option to send an email n...

Страница 109: ...r 8 billion gigabytes If the LV will use Replication the LV size must be set to 16TB the maximum LV size supported by Replication function 3 Select Yes from the confirmation message to create the LV 4...

Страница 110: ...low more space for storing data To extend the LV size follow these steps 1 Select the LV that will be extended then click Extend LV Size button 2 Enter in the Extend size box the additional size to be...

Страница 111: ...4 Verify the new LV size...

Страница 112: ...be created manually or scheduled Admin needs to enable first this special function NOTE Logical Volume with snapshot cannot be extended nor replicated see next section about Volume Replication To enab...

Страница 113: ...message will appear Select Yes 3 The Snapshot configuration window will be displayed A system created Snapshot name is automatically created The default snapshot name can be renamed if needed Enter th...

Страница 114: ...t of free space on the volume group where the new snapshot volume will be created Mount When checked the created snapshot volume will be automatically mounted When a snapshot volume is mounted the exi...

Страница 115: ...Create Snapshots Based from Schedule To create scheduled snapshots 1 Select the Logical Volume go to Snapshot tab and click Edit 2 Edit the following snapshot options listed below then click Save whe...

Страница 116: ...for use Execute Day Specifies whether the scheduled task is to run on the selected day s Execute time Once Specifies the time of the day when the scheduled task will be taken Every Specifies how often...

Страница 117: ...5 When the snapshot setting of LV has been set click Enable Scheduled to active scheduled snapshot 6 A clock like icon will appear on the left side of the LV which means a scheduled snapshot is activ...

Страница 118: ...le the Enable Scheduled button will become available 8 1 3 3 Delete Snapshots 1 Select the Logical Volume where snapshot will be deleted then go to Snapshot tab Click the snapshot that will be deleted...

Страница 119: ...2 Select Yes to delete the snapshot 3 A process window will be shown 4 The deleted snapshot will no longer exist in the Snapshot List...

Страница 120: ...solution creates a real time replication of data However it does not create a HA cluster solution where you can have a highly available solution Note Logical Volume under snapshot cannot be replicated...

Страница 121: ...SR TRITON16Ni subsystems 2 On the primary SR TRITON16Ni subsystem source select the Logical Volume which will be replicated then click Create Replication NOTE The logical volume to be replicated from...

Страница 122: ...nnel between the source and destination NAS servers This is where the replication of data takes place Please be sure to have a good connection on this medium As much as possible set this channel as a...

Страница 123: ...abit Ethernet Send buffer size K It is the size of the TCP socket send buffer You can specify smaller or larger values Larger values are appropriate for reasonable write throughput with asynchronous p...

Страница 124: ...server under the specified VG At this point the Replication is not yet initialized and no synchronization Replication still needs to be initialized After selecting Initial Replication button the firs...

Страница 125: ...replication setting will be initialized 7 The volume replication synchronization process will start 8 After the initial synchronization process is completed the Status will show Primary Secondary UpTo...

Страница 126: ...the secondary node must not be mounted Please do not attempt to mount it manually Setting the primary volume to be secondary To set the primary volume to be secondary just press the Set Secondary but...

Страница 127: ...ed 16TB The following are the steps Abort the replication by selecting Abort Replication Remove or delete the replicated logical volume on the destination proNAS Extend the capacity of the source logi...

Страница 128: ...iSCSI target LUN Note You cannot enable the iSCSI function in a Logical Volume if Snapshot or Replication exists To enable iSCSI function select Volume Manager then click Options tab and tick Enable...

Страница 129: ...want to enable CHAP authentication check the Enable Auth CHAP option and enter the account and password NOTE Valid characters for iSCSI Target name are a z A Z and 0 9 Other special characters and spa...

Страница 130: ...progress box will be displayed 7 The iSCSI volume is ready Note that there is an i icon on the left of logical volume name to denote that this is an iSCSI volume 8 You may now connect to the iSCSI tar...

Страница 131: ...I 1 Select the logical volume and click the iSCSI tab 2 Click Edit and remove the check mark in Enable iSCSI option Click Save when done 3 A confirm message box will be displayed Select Yes to proceed...

Страница 132: ...ng data in the logical volume will be deleted so if there are important data in the logical volume a backup must be made To restore iSCSI to normal volume 1 Select the logical volume and click the iSC...

Страница 133: ...ess window will show that the volume is being restored back to normal logical volume 5 The logical volume is restored to normal volume Note that the i icon on the left of logical volume name has been...

Страница 134: ...SCSI volume Click Extend LV Size 2 Enter the additional capacity for the volume in the Extend size box Note that you cannot exceed the free available size from the volume group Click OK 3 A Confirm me...

Страница 135: ...4 The iSCSI logical volume capacity is extended...

Страница 136: ...kgroup Windows domain name or workgroup Domain name is limited only up to 15 characters For example mydomain DNS Suffix The DNS suffix appended to server name to complete the server s FQDN This includ...

Страница 137: ...pter A default gateway is a local IP router that is used to forward packets to destination beyond the local network Only one default gateway can be enabled in a certain time Device Displays the type o...

Страница 138: ...l key then at the same time select the adapters that will be included in the network trunking then click on Trunk Adapter button 2 A warning message will be displayed Click OK to proceed 3 Setup the n...

Страница 139: ...the same slave for each destination MAC address This mode provides load balance and fault tolerance Link Aggregation 802 3ad 802 3ad policy Combines multiple physical network links into a single logic...

Страница 140: ...ton Configuration options DHCP s IP range starting from means the lower bound starting range of private IP addresses for DHCP DHCP s IP range ending with means the upper bound ending range of private...

Страница 141: ...network traffic Select Service tab of System Manager then enable SNMP MRTG service Click Start to enable the service To view the SNMP MRTG network traffic information select the SNMP tab in Network M...

Страница 142: ...test whether a particular host is reachable or to check connectivity to a particular IP address To test enter the IP address in the IP address box then click Network Test button The result will be dis...

Страница 143: ...rnal Accounts Integration Joining Windows or NIS Domain You can utilize external directory services to authenticate accounts Currently PDC ADS and NIS authentication are supported You may choose any o...

Страница 144: ...ed in Windows authentication To manually select the encryption type disable this option and select the preferred encryption type from the EncType drop down list Enable NTLMv2 authentication This param...

Страница 145: ...C or ADS If needed change the encryption type to the same type used by your domain server Click Save The NAS will be joined to Windows Domain in a while To verify select Account under Account Manager...

Страница 146: ...unt Manager to verify that the NIS Accounts are listed in the Account List or select Group to display the NIS Groups in the Group List 8 3 2 Local Account and Group Management Account Management The A...

Страница 147: ...r in the proFamily tree Choose Account node under the Account Manager It will display all accounts under the Account List tab 2 Press the Create button System will display Account List tab Account Lis...

Страница 148: ...e set in Quota Size will become the new default Quota Size when other accounts are created Set Password Click this button to set the account s password Passwords have to be at least 6 characters Statu...

Страница 149: ...be a member of users group Enabling and Disabling an Account Account Manager allows the administrator to enable or disable a user account When an account is disabled the account cannot be used to log...

Страница 150: ...nt and password can not be modified in proNAS Account Manager In such a case you can only modify the permissions Importing of Accounts The proNAS operating system provides Import Account function for...

Страница 151: ...ess to the Sales Report share All account members of the Sales group can have access to the Sales Report share Group List tab The Group List tab shows the Local and External ADS PDC or NIS Groups Grou...

Страница 152: ...Create button 2 Enter the necessary information Refer to options below Create Group Options Group Name Enter the name of new group It should be unique GID Group ID proNAS will either automatically as...

Страница 153: ...ent Member s list To remove an account from the group select the account in Current Member s list then click button 4 Click Save button to save settings Deleting a Local Group To delete a group select...

Страница 154: ...into another share using file level replication Rsync utility is used to copy files either to or from a remote host or locally on the current host In the Share List tab you can list the current share...

Страница 155: ...es Protocol and Privilege tabs Refer to Properties Setting Protocol Setting and Privilege Setting Sections in the succeeding pages 3 Click Save button to save share settings NOTE After creating the sh...

Страница 156: ...ts child directories and files For example if user1 has read write permission on the sub folder but read only on the share after applying ACL user1 will now have a read only permission on the sub fold...

Страница 157: ...share all the data in the share is deleted If the data in the share is no longer needed or a backup of the data has been made you may delete a share If there is no data backup we recommend you to crea...

Страница 158: ...lay the available space of the volume group Create New Volume LV If you check this option system will create LV as well as create the new Share The LV name will be the same as the share name Volume Se...

Страница 159: ...in can login to the share with Read Write privilege 1 Select Share Manager Select the share name that will be made accessible to all users 2 In the Properties tab click Edit Select tick the Public 777...

Страница 160: ...X also support CIFS share connection without using AppleTalk Case sensitive This control whether filenames are case sensitive Hide files that begins with dot This option controls whether files starti...

Страница 161: ...in the appropriate filesystem which is easy but also that it is in the exported tree which is harder Accessing proNAS shares under Linux For NFS share Usage mount t nfs x x x x mnt proNAS volume shar...

Страница 162: ...folder select the group name and press REMOVE button Sample Steps to Assign Group Account Permission to Share 1 Select Share Manager Select the share name where account will be given permission and cl...

Страница 163: ...he users group from the permission list in order to prevent access of other members of users group to the share Choose the account and press ADD button and the account will be displayed in the permiss...

Страница 164: ...ccount name that will be given permission and click ADD NOTE When account name is selected it will be highlighted If you want to select more than one account at the same time press Shift key then clic...

Страница 165: ...will not be honored Sample Steps to Limit Share Connections to Selected IP Range 1 Select Share Manager Select the share name where account will be giver permission and click Privilege tab 2 Click Edi...

Страница 166: ...re the share permissions defined in proNAS Read Only Read Write Allow Deny Allow Deny Access share sub folder Access share sub folder Read Read Write Write Edit Modify Edit Modify Delete Delete Rename...

Страница 167: ...S can accept incoming Rsync connections where as in client mode proNAS is the one who initiates the synchronization To use as a server mode you must start the RSYNC server first Go to System Manager S...

Страница 168: ...d all files within this share will be read only to any Rsync client Anonymous When checked anonymous connections will be accepted Maximum Connections This specifies the maximum number of Rsync client...

Страница 169: ...ress of the remote Rsync server Remote Path This specifies the share on the remote Rsync server Account The valid account name that will be required by the Rsync server for authentication Password The...

Страница 170: ...al backups You can additionally specify a backup suffix using the suffix option otherwise the files backed up in the specified directory will keep their original filenames suffix SUFFIX This option al...

Страница 171: ...ting the above settings you can run the Rsync client task immediately by clicking the Execute button Rsync Schedule You can automate the Rsync client tasks simply by running it thru schedule Please se...

Страница 172: ...n files will be directed to a share which you can access via share protocols or by telnet service Duplication can be invoked manually or by schedule Select the share folder in Share Manager then click...

Страница 173: ...Numbers Specifies the total number of snapshots that can be created The maximum total number of duplication a share can have is 256 NOTE The destination space must be larger than the source proNAS ope...

Страница 174: ...plication files on the previous destination path will not be removed Duplication files of other shares on the same destination path will not also be removed Getting the Duplication List To get the lis...

Страница 175: ...ntain the most recent snapshot and the duplication with the highest interval number will contain the oldest snapshot When a new duplication is run it will rotate all the duplication directories The fi...

Страница 176: ...l users It cannot be deleted public a share intended for all users Any type of user including guests or anonymous can logon to this share and is given read write permissions proBackupDevice holds the...

Страница 177: ...rating system settings and services such as Firmware Upgrade Account and Share reports Date and Time Zone Serial Ports and UPS settings Reboot functions and Services configurations NOTE Some informati...

Страница 178: ...s in the subsystem Free means the disks those are not joined in volume group Vol Group Numbers The total number of volume groups Volume Numbers The total number of logical volumes Snapshots will also...

Страница 179: ...subsystem will automatically search the Partners Data System s ftp site for the latest operating system version It is always recommended to contact Partners Data Systems Technical Support team have a...

Страница 180: ...or Share or both and set the Day and Time when to generate the report The system will generate the report and save in the path mnt proNAS home admin The path can be modified If you would like to recei...

Страница 181: ...e time change the hours and minutes If you would like to synchronize time with NTP server select Synchronize time to NTP servers The system will display two NTP servers by default If you would like to...

Страница 182: ...e dumb mode you don t have to configure the detail setting about vendor and cable If you choose smart mode proNAS OS supports three UPS Vendor a APC b BeamTech and c HyperPro Select the UPS vendor the...

Страница 183: ...the subsystem or the IPMI BMC web based GUI to perform a remote power on of the subsystem See chapter for SR TRITON16Ni IPMI BMC or SR TRITON16Ni Quick Start Guide for setup steps Scheduling Power Off...

Страница 184: ...tely proNAS OS press Shutdown Now or Reboot Now If you check there is file error or I O error from system log or VG cannot mount or system shutdown abnormally it is recommended to use the function Reb...

Страница 185: ...se the SR TRITON16Ni subsystem If you would like to enable service while booting please check Enable on Boot option You can also press Start All Services button to run all services or press Stop All S...

Страница 186: ...OS use You need to enable this service always The default port number used is 80 Telnet Ftp service Provides users access proNAS OS with telnet or ftp NOTE By default maximum number of Telnet and FTP...

Страница 187: ...by File Manager Options are English and Traditional Chinese SSH Service Allows root login via SSH service Enable SFTP The default settings of 2 options are set to no If necessary change the setting fr...

Страница 188: ...can click the Connections button to display current connection list Click the Top button to display system summary information and tasks list Click the PS button to display information about active p...

Страница 189: ...8 5 10 MRTG tab This tab shows information about MRTG graphs and includes CPU Loading Memory Usage Disk IO and Network Traffic of the SR TRITON16Ni subsystem...

Страница 190: ...lan List which includes backup plan name next backup time and if the backup plan schedule is enabled If you would like to create new backup plan please press Add Backup Plan button Attaching a tape dr...

Страница 191: ...h you would like to save the file and enter the file name System will backup the configuration information as an xml file If you would like to restore the configuration later press Apply button NOTE N...

Страница 192: ...Backup Plan Name and then press to choose the backup destination your destination could be remote share or local device NOTE If a disk is already selected as Local Device backup destination the disk s...

Страница 193: ...chine you may query it by using the command smbclient bash 3 00 smbclient L 192 168 100 164 Login account Account that has full access permission on the remote share For NFS Path 192 168 100 164 PathT...

Страница 194: ...ack to Backup Plan Setting tab In the field of Description system will display your backup destination remote share tape local disk in Type area Please press Edit Backup Item List button System will d...

Страница 195: ...backup stores all files that have changed since the last backup The advantage of an incremental backup is that it takes the least time to complete However during a restore operation each incremental b...

Страница 196: ...ettings Go back to Backup Plan Setting tab You will see the backup plan in the Backup Plan List If you would like to modify the backup plan please choose the backup plan in the left tree node and pres...

Страница 197: ...ron daemon DSK This log contains information about the changes to volume Its path is var log storage log It can store information of 7 days CRO crontab This contains Crontab information BAK This log c...

Страница 198: ...e IP address of the SMTP server Port Enter the port number Default is 25 Accounts Enter the SMTP server admin account Password Enter the SMTP server admin password To enter a recipient s e mail addres...

Страница 199: ...pose proNAS Web service stopped Notify if Apache web service is stopped proNAS Over Quota Notify if a logical volumes exceeds the given quota full or almost full Please check the Send email when not e...

Страница 200: ...ers to save the file in the local computer instead Upload a file User needs the write permission of the folder and the file itself A browser s upload window will show up and user needs to locate the f...

Страница 201: ...er can grant the access permission of a share to other accounts or access groups User also can manage the ACL of all the files and sub folders under the share The function of access right is for share...

Страница 202: ...nager will display and help users to understand the possible options and to perform file management There are 4 Main Menus in the File Manager screen CurrentDir Upload Setting and Logout There are als...

Страница 203: ...t permitted This must be done in Share Manager in SR TRITON16Ni proNAS OS GUI Current Dir Shows possible options that can be done in the current directory Create Allows user to create a new directory...

Страница 204: ...ows user to change the Access Rights of different users on the current directory Upload An option used to upload a local file into the current directory Use the Browse button then select the file to u...

Страница 205: ...e current directory or sub folder To update other directories or sub folders below the current directory use the Apply ACL button This will propagate the current ACL to the ACL off all files and sub f...

Страница 206: ...bers of the proBackup group can login to proBackup and perform proBackup functions Before admin or proBackup user can login to proBackup Java GUI the proBackup service must be started in Service tab o...

Страница 207: ...The proBackup page will be displayed Click Start Java Web Enter the login account admin and password 00000000...

Страница 208: ...on privilege persons can assume the role of administrator since it can restore all others data which may contain sensitive information The proBackup Java GUI Welcome screen will be displayed You can v...

Страница 209: ...10 3 Create Backup Plan To create backup plan either click the Create Plan button in the proBackup main screen or click the New button in Plan Manager...

Страница 210: ...ntry Home Directory Click the button then select the directory when data will be backed up Backup File Directory Entries Click the button Select the files and or directories to be backed up then click...

Страница 211: ...a Disable button will appear which can be used to deactivate the backup schedule Delete Deletes the current backup plan Run Execute the backup plan immediately Edit Use this to change settings in the...

Страница 212: ...before starting a new full backup How many recent cycles of backups are preserved Enter a number which is the total number of backup cycles that will be preserved A backup cycle starts with a full bac...

Страница 213: ...ab Log details is used to display detailed information about the execution process Error log will display errors that happened during the execution process Search will allow you to search for a string...

Страница 214: ...rnative to do backup or restore is to use the Backup Wizard and the Restore Wizard Click proBackup in the left tree node The Welcome screen will be displayed where the Backup Wizard and Restore Wizard...

Страница 215: ...the History tab The Execution Log Detail window will appear Click Restore Then input the destination where the data will be restored Or click the Browse button then select the destination directory or...

Страница 216: ...10 5 Account Detail Under Plan Manager click the account name to view information about the account...

Страница 217: ...critical operations of that server over to the peer server automatically The switch over procedure can also be triggered manually to handle scheduled downtime more gracefully and user transparently Pr...

Страница 218: ...led snapshot task enabled either on each SR TRITON16Ni node 10 ProNAS HA service cannot be started if iSCSI volume exists Replication is running or snapshots exist Make sure to remove all iSCSI volume...

Страница 219: ...et network running TCP IP protocol Each server must install a dedicated IP to attach to the private net RS 232 serial port One free serial port per server A null modem cable must be installed to conne...

Страница 220: ...rvice for both proNAS servers Select System Manager and then Services tab and highlight proNAS HA service then click Start proNAS HA node will then appear on the left tree after the service starts suc...

Страница 221: ...l fails proNAS HA will proceed with failover or takeover The IP of a router or any network device which is always online can be used as a Reference IP IP Address Enter the IP address of the Reference...

Страница 222: ...ration Start Cluster Start Cluster Operation Get peer IPs Get the IP s of the peer server and display it in the host peer table Network Test Tool for testing network IP address e g ping ip Volume Stat...

Страница 223: ...P eth0 IP address for both proNAS servers Private Net Ethernet Local peer Port Number Specify an unused TCP port for each server to receive the heartbeat sent from the peer server The default value is...

Страница 224: ...Serial Port Specify an unused serial port for each server to receive the heartbeat sent from the peer server Baud Rate Specify the Baud Rate of the selected serial ports Heartbeat Interval Specify th...

Страница 225: ...vers and at least one of the private net is functioning Buttons Add Resource Group button Add new resource group member User can specify the name of the resource group This name must be unique for the...

Страница 226: ...o the Target server automatically when the Target Server is available again Auto Bring In An option for enabling the resource group to be brought in automatically when Cluster is started Buttons Bring...

Страница 227: ...the peer server will be taken over Can skip if releasing resource fails This option is disabled by default Basically all of the resource group of the peer server will be taken over when the peer serv...

Страница 228: ...18 Click the resource group name on the left tree node then press Bring In The resource name will be brought in 19 The Cluster Servers will be in Active Standby mode...

Страница 229: ...Mode Error Mode Fail Mode Offline Mode Standby Mode Startup Mode The private net status The colored lines between the servers indicate the status of the private net Also status is displayed in the fu...

Страница 230: ...cal and Peer Server Resource Group box Display the resource group status Buttons Stop Cluster button Stop Cluster Operation Start Cluster button Start Cluster Operation Get peer IPs button Get the IP...

Страница 231: ...logical volumes will still have Replication After you clear all HA configuration and clear all Replication you can re configure another HA This is normally used when one of the SR TRITON16Ni nodes has...

Страница 232: ...ill be displayed Click Yes to remove Replication in all logical volumes or No to just clear HA but replication of logical volumes still exists 4 An information message will be displayed Click OK to cl...

Страница 233: ...hem to proNAS HA users must first get the S Ns of the two proNAS HA nodes see screenshot below Forward the S Ns to your Partners Data Systems account manager or our technical support team After receiv...

Страница 234: ...Event Log Properties All the messages generated by proNAS HA will be displayed in the Event Log The messages can help users to identify the possible reasons that prevent ProNAS HA from operating norm...

Страница 235: ...ing IPMI 2 0 IP address Power down the SR TRITON16Ni subsystem using the proNAS GUI shutdown function and then power back on using the main power switch 1 During boot up press DEL key to go into BIOS...

Страница 236: ...2 Select Set LAN Configuration and press Enter key 3 Setup LAN Configuration...

Страница 237: ...TATIC Setup the correct IP address and Subnet Mask for IPMI monitor or you can choose to use DHCP in IP Address Source for dynamic IP address 5 Select Save LAN Configuration and press Enter key With O...

Страница 238: ...6 Press F10 to save configuration changes and exit setup With Ok selected press Enter key to restart system...

Страница 239: ...7 System will reboot There IP address that was setup before will be displayed in IPMI boot up message 8 Use eth1 LAN2 for IMPI connection...

Страница 240: ...2 Connect to web GUI and Managing proNAS server board Default username is root password is superuser 1 System Information This page shows system power on status and firmware revision and its release d...

Страница 241: ...motherboard sensor readings and events SDR Sensor reading Sensor events System event log and PEF Platform event filters are implemented in compliant with ipmi2 0 specification 3 Sensor Reading temper...

Страница 242: ...4 Event Log View event log 5 Configuration This page contains options to configure Alerts Mouse mode Network SMTP Users and Date Time NTP Settings...

Страница 243: ...ns use Modify button to configure it or use Send Test Alert to test sending alert to the destination This Modify Alert page contains drop down menu s and fields to configure alert types email SNMP tra...

Страница 244: ...e OS installed on Local Host with IPMI not the remote console Absolute mode Most modern Windows versions 2000 XP 2003 Vista 2008 and Mac OS X Default Relative mode Most Linux distributions SuSE RHEL a...

Страница 245: ...8 Network Use this page to view and configure network settings 9 SMTP For email alert Enter and Save the SMTP mail server IP in this page...

Страница 246: ...page allows user to perform various remote operations such as Console Redirection Power Control and Other Control 11 Remote Console Redirection Press Java Console button to invoke JViewer to start KV...

Страница 247: ......

Страница 248: ...12 Remote Power Controls Select options in this page to reset power off power on or power cycle the SR TRITON16Ni subsystem...

Отзывы: