Error
Code
Diag.
Code
Device
Display
Meaning for the LMV5x System
Corrective Action
Any #
-
O2 monitor
1) If fault occurs sporadically, reduce electrical noise.
2) If fault occurs continuously, replace LMV5.
01
Below O2 Min
Value
O2 value has dropped below O2 min. value
1) Check the %O2 between the O2 guard curve and the
O2 setpoint curve. Increase the %O2 "gap" between
these two curves at the load point where the fault is
occurring.
2) Check for mechanical lash (slop) between actuators
and dampers / valves. Also check dampers for worn
bearings. Change to zero lash flexible couplings if
necessary.
3) If necessary, adjust parameters
O2ModOffset
and /
or
O2CtrlThreshold
02
O2 Min Values
undefined
Invalid O2 min. value
Set a point for the O2 min value curve (or O2 guard
curve) for each point set up on the ratio control curve
(12 points on ratio control curve = 12 points on O2 min
value curve)
03
O2 Setpoints
undefined
Invalid O2 setpoint
Set a point for the O2 setpoint curve (or O2 Control
Curve) for each point set up on the ratio control curve
except for point 1 (12 points on ratio control = 11 points
on O2 setpoint curve)
04
O2 Delay Time
undefined
Invalid O2 delay time
The delay time has not been measured successfully at
Point 2 or the highest curve point. See O2 trim section
for possible causes.
05
Actual O2 Value
invalid
No valid actual O2 value in operation for ≥ 3 s
1) Check the wiring between the O2 Module and the O2
sensor.
2) Check the power supply to the O2 Module
06
O2 Value
Prepurging
not reached
During prepurging, the parameterized air
oxygen content of +/- 2 % was not reached
1) Check the parameter
O2 Content Air
. This %O2
must be reached /- 2% during prepurge.
2) Check prepurge time. The time that is set may not
be long enough to completely purge the boiler.
3) Sensor may be dirty. Do not blow out with
compressed air when hot! Cool, then blow out with low
pressure compressed air (less than 15 psi).
4) O2 Sensor may have reached the end of its service
life (check resistance through AZL -
QGO Resistance
)
If greater than 140 -150 ohms, replace sensor.
B5
LMV5..
Fault with Base Unit (LMV5) or Oxygen Sensor (QGO2..)
Section 7
Page 55
SCC Inc.
HOME
HOME
Содержание LMV 5 Series
Страница 2: ...Intentionally Left Blank ...
Страница 25: ...LMV Series Technical Instructions Document No LV5 1000 SCC Inc Page 21 Section 1 Intentionally Left Blank HOME ...
Страница 27: ...LMV Series Technical Instructions Document No LV5 1000 SCC Inc Page 23 Section 1 Intentionally Left Blank HOME ...
Страница 41: ...LMV Series Technical Instructions Document No LV5 1000 SCC Inc Page 7 Section 2 HOME ...
Страница 42: ...Technical Instructions LMV Series Document No LV5 1000 Section 2 Page 8 SCC Inc HOME ...
Страница 43: ...LMV Series Technical Instructions Document No LV5 1000 SCC Inc Page 9 Section 2 HOME ...
Страница 44: ...Technical Instructions LMV Series Document No LV5 1000 Section 2 Page 10 SCC Inc HOME ...
Страница 45: ...LMV Series Technical Instructions Document No LV5 1000 SCC Inc Page 11 Section 2 HOME ...
Страница 46: ...Technical Instructions LMV Series Document No LV5 1000 Section 2 Page 12 SCC Inc HOME ...
Страница 47: ...LMV Series Technical Instructions Document No LV5 1000 SCC Inc Page 13 Section 2 HOME ...
Страница 48: ...Technical Instructions LMV Series Document No LV5 1000 Section 2 Page 14 SCC Inc HOME ...
Страница 49: ...LMV Series Technical Instructions Document No LV5 1000 SCC Inc Page 15 Section 2 HOME ...
Страница 50: ...Technical Instructions LMV Series Document No LV5 1000 Section 2 Page 16 SCC Inc HOME ...
Страница 51: ...LMV Series Technical Instructions Document No LV5 1000 SCC Inc Page 17 Section 2 HOME ...
Страница 52: ...Technical Instructions LMV Series Document No LV5 1000 Section 2 Page 18 SCC Inc HOME ...
Страница 53: ...LMV Series Technical Instructions Document No LV5 1000 SCC Inc Page 19 Section 2 HOME ...
Страница 54: ...Technical Instructions LMV Series Document No LV5 1000 Section 2 Page 20 SCC Inc HOME ...
Страница 55: ...LMV Series Technical Instructions Document No LV5 1000 SCC Inc Page 21 Section 2 HOME ...
Страница 56: ...Technical Instructions LMV Series Document No LV5 1000 Section 2 Page 22 SCC Inc Intentionally Left Blank HOME ...
Страница 116: ...Technical Instructions LMV Series Document No LV5 1000 Section 3 Page 58 SCC Inc Intentionally Left Blank HOME ...
Страница 150: ...Technical Instructions LMV Series Document No LV5 1000 Section 4 Page 32 SCC Inc Intentionally Left Blank HOME ...
Страница 170: ...Technical Instructions LMV Series Document No LV5 1000 Section 5 Page 18 SCC Inc Intentionally Left Blank HOME ...
Страница 290: ...Technical Instructions LMV Series Document No LV5 1000 Section 8 Page 20 SCC Inc Intentionally Left Blank HOME ...
Страница 306: ...Technical Instructions LMV Series Document No LV5 1000 Section 9 Page 14 SCC Inc Intentionally Left Blank HOME ...
Страница 373: ...Intentionally Left Blank ...