ENGINE REPAIR 6A-83
Installation
1) Proceed in reversing removal procedures. Apply the
specified tightening torques and noting the following
remarks:
• Revise the worthiness of pushing ball bearing,
pressure plate and disc of clutch.
• Apply in the end of primary shaft recommended
grease.
• Be cautious when trying to connect engine and gear
box avoiding catches and over efforts caused by
misalignments.
• Verify the worthiness of silentblocks at the front
seatings replacing them if worn or damaged.
• Check the worthiness of air and water hoses, vacuum
hoses, servosteering hydraulic hoses, fuel pipes,
impermeabilizing gaskets, braces, exhaust tube
supports, etc... Substitute those pieces where
damage or aging are detected.
• While install, be sure there are no rubbings of pipes
and hoses with metallic parts or between themselves;
no bendings or crushings.
• Make sure that the electric leads are firmly connect.
Tightening torques:
• Nuts for connection gear box to engine:
4 ÷ 6 Kg-m (40 ÷ 60 Nm)
• Screws for connection gear box to engine:
4 ÷ 6 Kg-m (40 ÷ 60 Nm)
• Nuts of the connection silentblocks to supports:
4,9 Kg-m (49 Nm)
• Linkage (38) sending oil to steering box:
3 ÷ 4 Kg-m (30 ÷ 40 Nm)
• Linkage (37) inlet oil to pump:
3 ÷ 4 Kg-m (30 ÷ 40 Nm)
• Supply and return raccord of fuel:
2,5 Kg-m (25 Nm)
(mechanical injection
(mechanical injection
(mechanical injection
(mechanical injection
(mechanical injection
engine ).
engine ).
engine ).
engine ).
engine ).
2) Execute the following tasks:
• Refill an level engine with engine oil (see 0B-5, point
1.3).
• Fille, purge and level of refrigerant circuit (see 0B-8,
point 1.5).
• Fuel supply system purge (see 6C-8).
• To fill and level servosteering hydraulic circuit
servosteering hydraulic circuit purge (see 0B-27, point
4.7).
• Servosteering hydraulic circuit purge (see 3B-12).
3) If vehicle fit air conditioning, plenish gage with
necessary equipment.
CAUTION:
Before start engine, fill central body of
turbocharger with oil through supply sleeve;
use new engine oil.
Checks and controls
1) Start engine and leave it at a rev. regime slightly over ticking
over regime, wait till the coolant comes to a temperature
ensuring the opening of thermostat (94ºC to 110ºC).
Afterwards, check the following points:
• There are no water leaks through the unions of houses
of refrigeration circuit.
• There are no oil leaks between the plungers cover and
cylinder head, between the oil housing and block,
between oil filter and its housing, between heat exchanger
and its housing and in the lubrication circuit.
• There are no fuel leaks through unions and linkages of
low pressure fuel pipes or through the rigid pipes of the
fuel injection.
• The light witnessing signals at the dash board work
correctly and those of control instruments which were
connected and disconnected during the removal and the
installation of engine.
NOTE:
Retighten, repair, correct or substitute any anomaly
or faulty pieces found during the corresponding
checks.
2) Do a trial driving on the road verifying everything is running
properly.
Содержание PS-10
Страница 1: ......
Страница 2: ......
Страница 5: ......
Страница 50: ......
Страница 53: ...BUMPERS FRONTHOODANDFRONTAL2 3 REAR BUMPER 1 Rear bumper 2 Side pad 3 Center pad 2 3 3 1 2 ...
Страница 57: ...BUMPERS FRONTHOODANDFRONTAL2 7 FRONTAL 1 Front Grille 2 Fender 3 Register Cover 4 Front Frame 3 4 2 1 ...
Страница 69: ......
Страница 90: ......
Страница 123: ...WHEELS AND TIRES 3F 7 TIGHTENING TORQUE SPECIFICATIONS Wheel nuts 11 17 110 170 ELEMENT TORQUE Kg m Nm ...
Страница 124: ......
Страница 149: ......
Страница 163: ......
Страница 209: ......
Страница 420: ...6C 38ENGINEFUELANDEMISSIONCONTROLSYSTEM CONNECTION DIAGRAM FROM CONTROL BOARD TO ENGINE COMPONENTS CONNECTOR A ...
Страница 422: ...6C 40ENGINEFUELANDEMISSIONCONTROLSYSTEM CONNECTIONS DIAGRAM FROM CONTROL UNIT TO VEHICLE COMPONENTS CONNECTOR B ...
Страница 447: ...TRANSMISSION 7 1 SECTION 7 TRANSMISSION CONTENTS GEARBOX 7A CLUTCH 7C TRANSFER BOX 7D FRONT AND REAR DIFFERENTIAL 7E 7 ...
Страница 448: ......
Страница 489: ......
Страница 505: ......
Страница 594: ...BODYSERVICE9 31 FRAME MAIN DIMENSIONS ...
Страница 595: ...9 32BODYSERVICE FRAME MAIN DIMENSIONS ...
Страница 601: ...ELECTRICAL DIAGRAMS ...
Страница 602: ...ELECTRICAL DIAGRAMS 2 ONLY COMMON RAIL POWER SUPPLY DIAGRAM ...
Страница 603: ...ELECTRICAL DIAGRAMS 3 ONLY COMMON RAIL ENGINE CONTROL SYSTEM ELECTRONIC FUEL INJECTION CONNECTOR A ...
Страница 604: ...ELECTRICAL DIAGRAMS 4 ONLY COMMON RAIL ENGINE CONTROL SYSTEM ELECTRONIC FUEL INJECTION CONNECTOR B ...
Страница 605: ...ELECTRICAL DIAGRAMS 5 ONLY COMMON RAIL STARTING HEATER VALVE DIAGRAM ...
Страница 606: ...ELECTRICAL DIAGRAMS 6 ONLY COMMON RAIL GLOW PLUG STARTING HEATER RELAY DIAGRAM ...
Страница 607: ...ELECTRICAL DIAGRAMS 7 ONLY COMMON RAIL FUEL FILTER SENSORS DIAGRAM ...
Страница 608: ...ELECTRICAL DIAGRAMS 8 ONLY COMMON RAIL DOUBLE STOP SWITCH ...
Страница 609: ...ELECTRICAL DIAGRAMS 9 ONLY COMMON RAIL FUEL PUMP ...
Страница 610: ...ELECTRICAL DIAGRAMS 10 ONLY COMMON RAIL DIAGNOSIS DIAGRAM ...
Страница 611: ...ELECTRICAL DIAGRAMS 11 ONLY COMMON RAIL A C DIAGRAM ...
Страница 612: ...ELECTRICAL DIAGRAMS 12 ONLY MECHANICAL INJECTION POWER SUPPLY DIAGRAM ...
Страница 613: ...ELECTRICAL DIAGRAMS 13 ONLY MECHANICAL INJECTION GLOW PLUG RELAY DIAGRAM ...
Страница 614: ...ELECTRICAL DIAGRAMS 14 ONLY MECHANICAL INJECTION INSTRUMENT PANEL ...
Страница 615: ...ELECTRICAL DIAGRAMS 15 ONLY MECHANICAL INJECTION COMBINATION METER DIAGRAM ...
Страница 616: ...ELECTRICAL DIAGRAMS 16 ONLY MECHANICAL INJECTION COOLING SYSTEM ...
Страница 617: ...ELECTRICAL DIAGRAMS 17 GENERAL DIAGRAMS HEADLAMP LEVELING SYSTEM DIAGRAM ...
Страница 618: ...ELECTRICAL DIAGRAMS 18 GENERAL DIAGRAMS REVERSE LAMP DIAGRAM ...
Страница 619: ...ELECTRICAL DIAGRAMS 19 GENERAL DIAGRAMS RADIO REAR WINDOW DEFOGGER ...
Страница 620: ...ELECTRICAL DIAGRAMS 20 GENERAL DIAGRAMS REAR DEMISTER STOP LAMP DIAGRAM ...
Страница 621: ...ELECTRICAL DIAGRAMS 21 GENERAL DIAGRAMS HORN DIAGRAM ...
Страница 622: ...ELECTRICAL DIAGRAMS 22 GENERAL DIAGRAMS TURN SIGNAL HAZARD LAMP DIAGRAM ...
Страница 623: ...ELECTRICAL DIAGRAMS 23 GENERAL DIAGRAMS LAMPS DIAGRAM ...
Страница 624: ...ELECTRICAL DIAGRAMS 24 GENERAL DIAGRAMS WASHER WIPER DIAGRAM ...
Страница 625: ...ELECTRICAL DIAGRAMS 25 GENERAL DIAGRAMS CHARGING SYSTEM DIAGRAM ...
Страница 626: ...Prepared by SANTANA MOTOR S A After Sales Service Department 1st Ed October 2002 Printed in Spain Printed October 2002 ...
Страница 627: ......