2. Installing RPCM
CAUTION!
To reduce the risk of injury, before connecting the power, check the grounding.
To avoid personal injury, adhere strictly to the power current requirements for occupational
safety and health.
2.2.4. Acclimatization
The maximum permissible temperature range for storage during storage is 20°C/h. Before turn-
ing on the Resilient Power Management Module (RPCM), it takes time to adapt to the new condi-
tions at least 24 hours for acclimatization. At this time, you can continue to physically install the
RPCM device. If condensation is present after 24 hours, wait until the condensation evaporates
completely before turning on the system.
Ambient conditions for the operation of the RPCM are the following:
operating range of environmental parameters 0-40°С;
operating range of relative humidity is 45-85% (without condensation);
operating range of altitude above sea level is 0-2000 m.
2.2.5. Checking the Packaging
Before unpacking the boxes, ensure that they do not have dents, cuts, stains and other damages
due to incorrect handling in the course of shipping . In case of damage is found, photograph the
packaging, contact the supplier and attach the photo.
2.2.6. Installing RPCM
Before starting the installation, ensure the ambient conditions for operations and power require-
ments are in accordance with the instructions in this User Manual.
Installing the Remote Power Management Module
Note
. If you purchased a cable fixation kit, install it before installing the RPCM in the rack.
To install RPCM:
1 install the rack nuts as in Figure 2.2.1;
2 mount the module RPCM on the rack and secure it as shown in Figure 2.2.2;
3 prepare the power lines to connect the module as shown in Figure 2.2.3 for RPCM DC ATS
76A or Figure 2.2.4 for RPCM DC 232A;
4 connect the power cables to the inputs;
5 connect power cables of the power equipment to outlet clamp terminals.
13