Machine settings
7
86
5.
Set the drop point to the position indicated in the fertiliser chart for the respec-
tive spreading material.
6.
Set the half-side slide to the position indicated in the fertiliser chart for the re-
spective spreading material.
7.
Set the metering slide stop to the scale value specified in the fertiliser chart.
8.
Activate the tractor and the drive of the machine.
9.
Open the metering slide for the calibration test time stipulated before (e.g. 60
seconds). Close the metering slide when this time has elapsed.
10.
Deactivate the drive of the machine and the tractor. Remove the ignition key.
11.
Determine the collected weight.
12.
Compare the actual quantity with the target quantity.
Actual quantity = target quantity: Application rate stop is set correctly.
End calibration test.
Actual quantity < target quantity: Set the application rate stop to a higher
position and repeat the calibration test.
Actual quantity > target quantity: Set the application rate stop to a lower
position and repeat the calibration test.
Содержание AXEO 16.1
Страница 8: ...Table of Contents VI...
Страница 40: ...Transportation without tractor 5 32...
Страница 104: ...Spreading work 8 96...
Страница 118: ...Maintenance and service 9 110...
Страница 130: ...Axle load calculation 13 122...
Страница 136: ......