Maintenance and service
9
98
9.2.2
Checking screw connections
Bolted joints have been tightened to the specified torque and locked at the factory.
Vibrations and shocks, in particular during the initial operating hours, can loosen
bolted joints.
With new machines, all screw connections are to be checked for their tight
seat after approx. 30 operating hours.
Check all the bolted joints regularly for tightness, and definitely before the
start of the spreading season.
Some components, e.g. spreading vanes or maintenance covers, are mounted
with self-locking nuts. When mounting these components always
use new self-
locking
nuts.
9.3
Cleaning
We recommend cleaning the machine with a soft jet of water immediately after
every use in order to maintain its value.
The following instructions must be observed for cleaning:
Only clean oiled machines at washing points fitted with an oil separator.
When cleaning with high-pressure water,
never
aim the jet directly at warning
signs, electrical equipment, hydraulic components, and sliding bearings.
After cleaning, we recommend treating the
dry
machine,
especially stainless
steel parts
, with an environmentally friendly anti-corrosion agent.
Содержание AXEO 16.1
Страница 8: ...Table of Contents VI...
Страница 40: ...Transportation without tractor 5 32...
Страница 104: ...Spreading work 8 96...
Страница 118: ...Maintenance and service 9 110...
Страница 130: ...Axle load calculation 13 122...
Страница 136: ......