- 81 -
9901.00.34DE00; 02.2017
6XEMHFWWRWHFKQLFDOPRGL¿FDWLRQV
O
PERATION
S
UPER
A
LBATROS
140 MW; S
ERIES
2
Adjusting the length
1.
4.
3.
2.
Ź
1.) Remove the hinged pin.
Ź
2.) Adjust the length so that the plough and the
parking support are stable on the ground.
Ź
3.) Secure the parking support by inserting the
hinged pin into the adjustment holes.
Ź
4.) Secure the hinged pin by throwing the
safety catch.
26.4 Move the subsoiler into the storage
position
Tools
•
2 ring spanners with a 24 mm width
Adjustment instruction
L
A
Before shutting down, the subsoiler on the ground
side must be moved from the working position (
A
)
to the storage position (
L
).
Moving the subsoilers
1
2
L
Ź
1.) Remove the shear bolt (1) and the pivot
bolt (2).
Ź
2.) Install the subsoiler in the storage position
(
L
).
Ź
3.) Insert the shear bolt (1) and the pivot bolt
(2) from the subsoiler side.
Ź
4.) Tighten the threaded connection.