- 79 -
9901.00.34DE00; 02.2017
6XEMHFWWRWHFKQLFDOPRGL¿FDWLRQV
O
PERATION
S
UPER
A
LBATROS
140 MW; S
ERIES
2
I
II
1.
4.
2.
3.
Ź
1.) Remove the retaining ring.
Ź
2.) Remove the locking pin and ...
Ź
3.) ... Adjust working depth by aligning the hole
in the rod (
I
) with the pawls in the bracket
(II).
Ź
4.) Insert the locking pin (2) in the required
hole and secure with the retaining ring.
Ź
Adjust all skimmers to the same working depth.
24.6.2 Vari Heavy Duty skimmers - lateral overlap
B
The lateral overlap (
B
) for the Vari Heavy Duty is
preset to between 2 and 3 cm in the factory.
25 A
FTER
THE
WORK
25.1 Required work
•
Move the plough into the transport position; for
instructions, see chapter 18 - page 57
•
Install the lighting.
25.2 Install the lighting
Remove the locking pin from storage:
1
3
2
Ź 8QVFUHZWKHVWDUJULSVFUHZ
1
).
Ź 5HPRYHWKHVSULQJFRWWHU
2
).
Ź5HPRYHWKHORFNLQJSLQ
3
) from
the frame tube.
5.
4.
3.
2.
1.
Ź
1.) Insert the lighting bar ...
Ź
2.) ... secure with locking pins.
Ź
3.) Insert the spring cotter.
Ź
4.) Screw the star grip screw tight.
Ź
5.) Insert the lighting cable plug.