- 50 -
9901.00.34DE00; 02.2017
Subject to technical modifications
O
PERATION
S
UPER
A
LBATROS
140 MW; S
ERIES
2
Rectifying turning faults
If it appears that the plough is not lifted high
HQRXJKZKHQWXUQLQJ
1
2
1
2
h
L
=
L
Ź
Shorten the lifting rods (
2
) to adjust the bottom
link (
1
) higher.
3
Ź
Offset the bottom link bolts (
3
) downwards.
1RWHVRQRIIVHWWLQJERWWRPOLQNEROWVLQ
chapter 45 - page 109
Ź
Attach the top link higher up on the tower.
Ź
Turn the top link less.
15 A
DJUSTING
THE
WORKING
WIDTH
Safety instructions
WARNING
Risk of accident due to crushing
during setup and adjustment work.
• Care must be taken during all work to
ensure that the implement is stable and
has been secured to prevent it rolling
away.
• Support the raised implement to
prevent lowering.
Required tools
•
2 x ring or socket spanner, AF 36 mm
•
Torque spanner
Adjustment instructions
B
B
1
•
Adjust all body brackets (
1
) to the same
working width (
B
).
After adjusting the working width, the following
settings must be adapted:
•
"Adjusting the track of the contact or
combination wheel" - page 51.
•
5HDGMXVWLQJWKH¿UVWERG\ZRUNLQJZLGWK
page 71.
•
"Re-adjusting the traction point" - page 69.
Preparation
Ź
Turn the plough to the working position.
Ź
Lift the plough until all bodies stand freely
above the ground.
Ź
Support the plough to prevent lowering.
Ź
Switch off the tractor and secure it to prevent
unauthorized start-up.