- 65 -
9901.00.34DE00; 02.2017
6XEMHFWWRWHFKQLFDOPRGL¿FDWLRQV
O
PERATION
S
UPER
A
LBATROS
140 MW; S
ERIES
2
Moving the subsoilers
NOTE
When assembling, observe the position
and alignment of the shear bolt (
2
).
1.
2.
b
A
Ź
1.) Remove the pivot bolt.
Ź
2.) Remove the shear bolt.
Ź
3.) Turn the subsoiler into the working position
(
A
) and install.
Ź
4.) Adjust the working depth by offsetting the
subsoiler in the connection points.
For information on adjusting the depth, see
chapter "Adjusting the subsoiler" - page 72.
Ź
5.) Insert the shear bolt (2) and the pivot bolt
(1) from the subsoiler.
Ź
6.) Tighten the threaded connection to the
correct torque.
Torque - shear bolt
Size
Quality grade 4.6
:LGWKDFURVVÀDWV
Nm
lb-ft
M 16
71
53
24
Torque - pivot bolt
Size
Quality grade 8.8
:LGWKDFURVVÀDWV
Nm
lb-ft
M 16
230
170
24
21 W
ORKING
INFORMATION
21.1 Safety during operation
DANGER
Risk of accident due to riding on the
implement
• Riding on the implement and standing
within hazard zones are prohibited.
DANGER
General risk of accident while working
with the implement.
• Always observe the safety instructions
in chapter 1.0 - page 9.
WARNING
Risk of accident while using the
LPSOHPHQWLQWKH¿HOG
• Prior to starting work, familiarize
yourself with all equipment and
operating controls, and their functions.
Warning
Risk of tipping due to the large
centrifugal mass of the implement.
When working on a slope, the large
centrifugal mass can cause the implement
to tip over.
• Pay attention to the position of the
centre of gravity when lifting and
turning.
Risk of accident due to crushing
during setup and adjustment work.
• Care must be taken during all work to
ensure that the implement is stable and
has been secured to prevent it rolling
away.
21.2 Working values: Working speed /
working depth
Working speed
Working speed = 4 km/h - 10 km/h
7KHZRUNLQJVSHHGGHSHQGVRQWKHIROORZLQJ
•
The composition of the ground
•
Plant cover
•
The working width
•
The working depth
•
Wear and tear