- 19 -
Any duplication of this instruction manual, whether in full or in part, is prohibited without written approval from Grégoire-Besson, regardless of the country, format or medium.
9901.00.34DE00; 02.2017
6XEMHFWWRWHFKQLFDOPRGL¿FDWLRQV
T
ABLE
OF
CONTENTS
S
UPER
A
LBATROS
140 MW; S
ERIES
2
23 Adjustments during operation ....................... 69
23.1 Re-adjusting the traction point ....................... 69
23.1.1. Adjustment
instructions
............................69
23.1.2.
Re-adjusting the traction point - Plough
with turnbuckle ..........................................69
23.1.3.
Re-adjusting the traction point - Plough
with hydraulic frame slewing .....................70
23.2
5HDGMXVWLQJWKH¿UVWERG\ZRUNLQJZLGWK
....... 71
23.2.1.
Adjusting the ploughs with adjusting
spindle ......................................................71
23.2.2.
Adjusting the ploughs with hydraulic
cylinders ...................................................71
24 Adjusting the equipment ................................ 72
24.1 Adjusting the trash boards .............................. 72
24.2 Adjusting the subsoiler .................................... 72
24.3 Adjusting the disc coulter ................................ 73
24.3.1.
Adjusting the disc coulter's working depth 73
24.3.2.
Adjusting the disc coulter side overlap .....73
24.3.3.
Adjusting the stop of the swing arm
on the disc coulter ....................................74
24.4 Adjusting the round rod skimmer .................... 75
24.4.1.
Adjusting the skimmer's working depth ....75
24.4.2.
Adjusting the skimmer with round rod’s
side overlap ..............................................76
24.4.3.
Adjusting the skimmer with round rod's
throwing angle ..........................................77
24.5 Adjusting the Vari-Fix skimmer ....................... 77
24.5.1.
Adjusting the Vari-Fix skimmer’s working
depth ........................................................77
24.5.2.
Vari-Fix skimmer - side overlap ................78
24.6 Adjusting the Vari Heavy Duty skimmers ........ 78
24.6.1.
Vari Heavy Duty - adjusting the working
depth ........................................................78
24.6.2.
Vari Heavy Duty skimmers - lateral
overlap ......................................................79
25 After the work .................................................. 79
25.1 Required work
................................................. 79
25.2 Install the lighting ............................................ 79
26 Parking the implement ................................... 80
26.1 Prerequisite
..................................................... 80
26.2 Note the following when parking ..................... 80
26.3 Fold the parking support out and adjust the
length .............................................................. 80
26.4 Move the subsoiler into the storage position ... 81
26.5 Parking the ploughs with combination wheel .. 82
26.5.1.
Coupling the top link .................................82
26.5.2.
Unlocking the central lock .........................82
26.5.3.
Turning the plough onto the right-hand
side ...........................................................82
26.5.4.
Turning the combination wheel into the stor-
age position ..............................................83
26.5.5.
Parking the plough ....................................83
26.6 Parking the ploughs with depth control wheel . 83
27 Uncoupling the implement ............................. 84
27.1 Disconnecting hydraulic connections .............. 84
27.2 Disconnect lighting
.......................................... 84
27.3 Uncoupling the top link .................................... 84
27.4 Uncoupling the bottom link .............................. 85
28 Storage information ........................................ 85
29 Cleaning ........................................................... 85
29.1 Safety instructions
........................................... 85
29.2 Cleaning information ....................................... 85
RECTIFY FAULTS .................................... 87
30 Troubleshooting .............................................. 87
31 Replacing the shear bolt on plough bodies . 88
31.1 Replace the shear bolt .................................... 88
31.2 Replacing the shear bolt - reinforced, double
shear shaft ...................................................... 89
32 Replacing the Vari Heavy Duty (VHD) shear
bolt ................................................................... 90
33 Replacing the shear bolt on the subsoiler ... 91
34 Adjust undercut .............................................. 92
35 Adjusting the spring force of the tower sus-
pension ............................................................ 95
MAINTENANCE ....................................... 96
36 Safety instructions - Maintenance and repair ..
96
36.1 Safety instructions - oils and greases ............. 96
36.2 Who may carry out maintenance? .................. 97
37 Test runs during or after maintenance ......... 97
38 Maintenance schedule .................................... 98
39 Lubricating points ........................................... 99
39.1 Lubricating adjusting spindles ....................... 100
40 Re-tighten all bolts ........................................ 101
40.1 Key threaded connections ............................. 101
41 Inspecting the hydraulics ............................. 102
41.1
,GHQWL¿FDWLRQRQDK\GUDXOLFKRVH
.................. 102
41.2 Check the hydraulic system .......................... 102
41.3 Pressure tank - checking and adjusting the gas
¿OOLQJSUHVVXUH
............................................... 102