Page 26
Preparation for Operation
Before switching on, check the following:
✓
Ultra 5
is mounted correctly and is in a ‘safe’ area.
✓
The power supply is correctly installed.
✓
The voltage selector switch is in the correct position.
✓
The relays are connected correctly.
Maintenance
There are no user serviceable parts inside
Ultra 5
, except the mains fuse. If
you experience any problems with the unit, then please contact Pulsar
Process Measurement for advice.
To clean the equipment, wipe with a damp cloth. Do not use any solvents on
the enclosure.
Important Information
The unique DATEM software comes into operation as soon as power is
applied, and is designed to monitor a
moving level
or
target
with the
transducer
in a
fixed position.
If, after any period of use, it should become necessary to move the
transducer, for any reason, from its original operating position, switch off
the
Ultra 5
, before proceeding, to prevent any undesirable updates to the
DATEM trace. If after moving the transducer the reading is not as expected,
please refer to
Chapter 9 Troubleshooting
.
Содержание ULTRA 5
Страница 1: ...ULTRA 5 INSTRUCTION MANUAL ...
Страница 2: ......
Страница 4: ......
Страница 15: ...Page 7 EU Declaration of Conformity Wall Mount ...
Страница 16: ...Page 8 Fascia Mount ...
Страница 17: ...Page 9 Rack and Panel ...
Страница 18: ...Page 10 This page left blank intentionally ...
Страница 21: ...Page 13 The full dimensions of the enclosure are as shown below ...
Страница 23: ...Page 15 The full dimensions of the Fascia mount enclosure are as shown below ...
Страница 25: ...Page 17 Dimensions of the panel enclosure are as shown below VOLTAGE SELECTOR AC POWER FUSE 230 115 ...
Страница 35: ...Page 27 This page left blank intentionally ...
Страница 151: ...Page 143 This page left blank intentionally ...
Страница 240: ...Page 232 This page left blank intentionally ...