Maintenance
165
Introduction
This chapter describes the routine maintenance procedures required to keep your
instrument in proper working condition and to ensure the highest possible level of
performance. It includes maintenance checks that should be done on a daily basis and
maintenance procedures that should be done periodically depending on instrument
use. This chapter is divided into several sections, each section covering maintenance
procedures for a particular component of the system.
You should perform only the maintenance procedures described in this chapter.
Record your daily maintenance procedures in the
ICP-OES Maintenance Log (Part.
No. 09936225)
. If additional maintenance is required, contact a PerkinElmer service
engineer. This instrument requires no specified inspection or preventive
maintenance to ensure the continuous functioning of its safety features.
Daily Checks
The following maintenance procedures should be done on a daily basis. Make sure
to inspect and replace any hoses which show signs of wear because their failure
could cause a hazard.
Daily Cleaning
At the end of each working day, it is recommended that you flush out the sample
introduction system for five minutes with the plasma on. After analyzing aqueous
solutions, flush with deionized water or a 2% nitric acid solution, followed by
deionized water. After analyzing organic solutions, flush the system using clean
solvent. Also clean the spectrometer housing using a mild lab detergent.
Caution
Attention
Before using any cleaning or decontamination methods except those
specified by the manufacturer, users should check with the manufacturer
that the proposed method will not damage the equipment.
Avant d'utiliser toutes les méthodes de nettoyage ou de décontamination,
sauf celles qui sont spécifiées par le fabricant, les utilisateurs doivent
vérifier auprès du fabricant que la méthode proposée ne sera pas
endommager l'équipement.
Содержание AVIO 200
Страница 1: ...AVIO 200 SPECTROMETER Hardware Guide ICP OPTICAL EMISSION ...
Страница 2: ......
Страница 3: ...AvioTM 200 Spectrometer Customer Hardware and Service Guide ...
Страница 12: ...Contents 10 ...
Страница 30: ...28 ...
Страница 31: ...Safety Practices 1 ...
Страница 32: ...30 Safety Practices ...
Страница 56: ...54 Safety Practices ...
Страница 57: ...Preparing Your Laboratory 2 ...
Страница 58: ...Preparing Your Laboratory 56 ...
Страница 70: ...Preparing Your Laboratory 68 ...
Страница 71: ...System Description 3 ...
Страница 72: ......
Страница 84: ...System Description 82 Figure 3 7 GemCone nebulizer and end cap N0680343 also shown in cross sec tional view ...
Страница 97: ...Installation 4 ...
Страница 98: ......
Страница 119: ...Installation 117 Figure 4 8 Replacing the torch 1 3 4 6 8 2 9 10 5 7 ...
Страница 121: ...Installation 119 1 2 7 9 8 10 3 4 5 6 ...
Страница 164: ...Installation 162 ...
Страница 165: ...Maintenance 5 ...
Страница 166: ......
Страница 184: ...Maintenance 182 1 2 7 9 8 10 3 4 5 6 ...
Страница 188: ...Maintenance 186 Figure 5 8 Replacing the Torch 1 3 4 6 8 2 9 10 5 7 ...
Страница 272: ...Maintenance 270 ...
Страница 273: ...Troubleshooting 6 ...
Страница 274: ......
Страница 293: ...Troubleshooting 291 Figure 6 1 Normal Plasma Conditions at 0 torch position ...
Страница 294: ...Troubleshooting 292 Figure 6 2 Normal Plasma at 3mm position ...
Страница 296: ...Troubleshooting 294 Figure 6 4 Aux Gas too high Air Leak or Spray Chamber Temperature too high ...
Страница 297: ...Troubleshooting 295 Figure 6 5 Injector too far forward ...
Страница 298: ...Troubleshooting 296 Figure 6 6 No Aux Gas Torch may be glowing ...
Страница 299: ...Troubleshooting 297 Figure 6 7 Air Leak or Spray Chamber Temperature too high ...
Страница 300: ...Troubleshooting 298 Figure 6 8 Thin Plasma due to leak in Plasma Gas Line ...
Страница 308: ......