Installation
104
3. Open the shut-off valve fully (turn counterclockwise). Partial opening may
defeat the action of the water separator portion of the system.
4. Close the shut-off valve fully (knob turned fully clockwise), then set the air
pressure on the air compressor to between 550 kPa (5.5 bar and 80 psig) and 825
kPA (8.25 bar and 120 psig).
5. Connect the air hose from the Air Dryer Filter to the SHEAR GAS SUPPLY
fitting on the side of the spectrometer.
6. Open the shut-off valve fully (turn counterclockwise).
Connecting the PolyScience Chiller
The PolyScience
®
WhisperCool
TM
Chiller must be used to supply cooling water to
the instrument. The PolyScience
®
WhisperCool
TM
Chiller comes with a complete
instruction manual. You should be familiar with this manual before proceeding.
The PolyScience
®
WhisperCool
TM
is available through PerkinElmer in the
following two configurations:
208/230V, 60 Hz
220/240V, 50 Hz
Before opening the shut-off valve, always check to make sure the filter bowls are
properly secured.
Injury can result if the bowls are blown off.
Avertissement: Avant d'ouvrir le robinet d'arrêt, toujours vérifier pour vous
assurer que les bols de filtre sont correctement fixés.
Des blessures peuvent
survenir si les bols sont arrachés.
Note
A qualified electrician must install the single wall receptacle for the
PolyScience
®
WhisperCool
TM
chiller.
!
Warning
Содержание AVIO 200
Страница 1: ...AVIO 200 SPECTROMETER Hardware Guide ICP OPTICAL EMISSION ...
Страница 2: ......
Страница 3: ...AvioTM 200 Spectrometer Customer Hardware and Service Guide ...
Страница 12: ...Contents 10 ...
Страница 30: ...28 ...
Страница 31: ...Safety Practices 1 ...
Страница 32: ...30 Safety Practices ...
Страница 56: ...54 Safety Practices ...
Страница 57: ...Preparing Your Laboratory 2 ...
Страница 58: ...Preparing Your Laboratory 56 ...
Страница 70: ...Preparing Your Laboratory 68 ...
Страница 71: ...System Description 3 ...
Страница 72: ......
Страница 84: ...System Description 82 Figure 3 7 GemCone nebulizer and end cap N0680343 also shown in cross sec tional view ...
Страница 97: ...Installation 4 ...
Страница 98: ......
Страница 119: ...Installation 117 Figure 4 8 Replacing the torch 1 3 4 6 8 2 9 10 5 7 ...
Страница 121: ...Installation 119 1 2 7 9 8 10 3 4 5 6 ...
Страница 164: ...Installation 162 ...
Страница 165: ...Maintenance 5 ...
Страница 166: ......
Страница 184: ...Maintenance 182 1 2 7 9 8 10 3 4 5 6 ...
Страница 188: ...Maintenance 186 Figure 5 8 Replacing the Torch 1 3 4 6 8 2 9 10 5 7 ...
Страница 272: ...Maintenance 270 ...
Страница 273: ...Troubleshooting 6 ...
Страница 274: ......
Страница 293: ...Troubleshooting 291 Figure 6 1 Normal Plasma Conditions at 0 torch position ...
Страница 294: ...Troubleshooting 292 Figure 6 2 Normal Plasma at 3mm position ...
Страница 296: ...Troubleshooting 294 Figure 6 4 Aux Gas too high Air Leak or Spray Chamber Temperature too high ...
Страница 297: ...Troubleshooting 295 Figure 6 5 Injector too far forward ...
Страница 298: ...Troubleshooting 296 Figure 6 6 No Aux Gas Torch may be glowing ...
Страница 299: ...Troubleshooting 297 Figure 6 7 Air Leak or Spray Chamber Temperature too high ...
Страница 300: ...Troubleshooting 298 Figure 6 8 Thin Plasma due to leak in Plasma Gas Line ...
Страница 308: ......