![Oxford Instruments OpAL Скачать руководство пользователя страница 55](http://html.mh-extra.com/html/oxford-instruments/opal/opal_system-manual_1664943055.webp)
System Manual
lñÑçêÇ=fåëíêìãÉåíë=mä~ëã~=qÉÅÜåçäçÖó==
lé^i
OKO
pÉêîáÅÉë=
For details of the services required, services panel, etc, refer to Appendix IDS.
OKP
aáëíêáÄìíáçå=~åÇ=ìëÉ=çÑ=káíêçÖÉå=îÉåí==
Nitrogen (N
2
)is supplied to the system via the services panel to allow the process chamber and
foreline to be filled during system venting. The N
2
distribution circuit is shown in the services
flow diagram; see the following paragraph.
Services flow diagrams of the
lé^i=
system is given in drawing G-SP71B29663. This drawing is
located in Volume 2 of this manual. Illustrations of this drawing is also given at the rear of
this Section.
Nitrogen enters the system at the services panel through a ¼” Swagelok bulkhead connector.
It is then fed to a regulator and pressure gauge (located behind a panel to prevent
unauthorized adjustment) via a stainless steel pipe. The outlet pressure of the regulator can
be manually adjusted. To set up the outlet pressure of the regulator, refer to ‘Operator
Adjustments’ in Section 5.
The outlet from the regulator is connected to:
a)
A check valve (over-pressure relief valve).
b)
The process chamber vent line.
OKPKN
`ÜÉÅâ=î~äîÉ=
The check valve is installed to limit the maximum pressure that the regulator can supply. The
valve is normally closed and will open at pressures above 5 psi. The outlet of the check valve is
fed to the air out connector on the services panel to allow any excess nitrogen to be piped
out of the cleanroom if required.
Process chamber vent line
The process chamber vent line supplies nitrogen to the process chamber during the venting
sequence via a restrictor and chamber vent valve. The chamber vent valve is pneumatically
controlled by the system software.
WARNING
IN A NORMALLY VENTED ROOM, THERE IS A LOW RISK OF
ASPHYXIA DUE TO VENT GAS DISPLACING AIR.
USERS SHOULD MAKE THEIR OWN RISK ASSESSMENT.
DO NOT REMOVE THE CHECK VALVE OR CAP THE AIR OUT
CONNECTOR; THIS WOULD COMPROMISE A SYSTEM SAFETY
FEATURE.
Services
Printed: 5-Oct-07, 9:30
Page 2-3 of 4
Issue 1: August 07
Содержание OpAL
Страница 14: ......
Страница 229: ...OpAL Open Load Atomic Layer Thermal Deposition System Installation Data Typical OpAL thermal system Issue 3 October ...
Страница 299: ...bèìáéãÉåí j åì ä ää lfmq póëíÉãë RF Automatic Matching Unit Issue 6 September 2005 Page 1 of 20 ...
Страница 319: ...ALD Ozone Delivery System Ozone Delivery System for FlexAL and OpAL Systems Equipment Manual Issue 1 July 2010 ...