ALD
Ozone Delivery System
Oxford Instruments Plasma Technology
Equipment Manual
INSTALLATION
Printed: 14-Jul-10, 7:11
Page 4-2 of 4
Issue 01: July 10
4.1
Installation
If the Ozone Delivery System is supplied with a
FlexAL
system, the cabinet is mounted on the
FlexAL
system frame (see Figure 4-1).
Figure 4-1: Mounting the cabinet on a FlexAL system
If the Ozone Delivery System is supplied with an
OpAL
system, the cabinet is mounted on a wall
(see Figure 4-2).
Figure 4-2: Mounting the cabinet on a wall
Refer to section 2 of this manual for a description of the required services.
Содержание OpAL
Страница 14: ......
Страница 229: ...OpAL Open Load Atomic Layer Thermal Deposition System Installation Data Typical OpAL thermal system Issue 3 October ...
Страница 299: ...bèìáéãÉåí j åì ä ää lfmq póëíÉãë RF Automatic Matching Unit Issue 6 September 2005 Page 1 of 20 ...
Страница 319: ...ALD Ozone Delivery System Ozone Delivery System for FlexAL and OpAL Systems Equipment Manual Issue 1 July 2010 ...