![Oxford Instruments OpAL Скачать руководство пользователя страница 257](http://html.mh-extra.com/html/oxford-instruments/opal/opal_system-manual_1664943257.webp)
System Manual
lñÑçêÇ=fåëíêìãÉåíë=mä~ëã~=qÉÅÜåçäçÖó==
lé^i
OKNKNKQ
píÉé=Q=Emçí=éêÉé~ê~íáçå=Ñçê=ÄìÄÄäáåÖF=
1) Purge bubbler lines.; see Fig 2-5.
2) Turn on argon purge and argon bubbler MFCs and pump out any residuals in the lines..
3)
Do not turn on the manual valves yet!
To chamber
Heated TEMAH pot pre-
fitted with manual valves.
Single
ALD valve
jacket heated
to 200 °C
Drip tray
Extraction port
1 m
3
/h
Precursor cabinet
N
2
purge
Purge
Dose
Bypass
Ar purge
500 sccm
Manual valve
Air driven nupro valve –manual control
Fast high temperature ALD valve
Ar bubbler
500 sccm
Switching
E
Fig 2-5: Step 4 (Pot preparation for bubbling)
OKNKNKR
píÉé=R=Emçí=éêÉé~ê~íáçå=Ñçê=ÄìÄÄäáåÖF=
1) Repeat Steps 3 and 4.
2) Carry out a leak check.
3)
Do not turn on the manual valves yet!
Precursor Source Pot
Printed: 7-Oct-07, 12:13
Page 7 of 20
Issue 1: September 07
Содержание OpAL
Страница 14: ......
Страница 229: ...OpAL Open Load Atomic Layer Thermal Deposition System Installation Data Typical OpAL thermal system Issue 3 October ...
Страница 299: ...bèìáéãÉåí j åì ä ää lfmq póëíÉãë RF Automatic Matching Unit Issue 6 September 2005 Page 1 of 20 ...
Страница 319: ...ALD Ozone Delivery System Ozone Delivery System for FlexAL and OpAL Systems Equipment Manual Issue 1 July 2010 ...