![Oxford Instruments OpAL Скачать руководство пользователя страница 193](http://html.mh-extra.com/html/oxford-instruments/opal/opal_system-manual_1664943193.webp)
System Manual
lñÑçêÇ=fåëíêìãÉåíë=mä~ëã~=qÉÅÜåçäçÖó==
lé^i
WARNING
BEFORE PROCEEDING WITH ANY MAINTENANCE WORK, READ SECTION 1 - HEALTH AND SAFETY
.
In PC 2000, on the
Pump Control
page, the Gas Pod
Interlock indicator
is coloured red.
1)
Check that the gas pod cover is in place and fitted correctly.
2)
In the gas pod, check the interlock microswitch and associated wiring.
3)
Check that the process chamber pressure is below 600 mbar.
Troubleshooting
Printed: 25-Oct-07, 11:47
Page 7-7 of 12
Issue 1: August 07
Содержание OpAL
Страница 14: ......
Страница 229: ...OpAL Open Load Atomic Layer Thermal Deposition System Installation Data Typical OpAL thermal system Issue 3 October ...
Страница 299: ...bèìáéãÉåí j åì ä ää lfmq póëíÉãë RF Automatic Matching Unit Issue 6 September 2005 Page 1 of 20 ...
Страница 319: ...ALD Ozone Delivery System Ozone Delivery System for FlexAL and OpAL Systems Equipment Manual Issue 1 July 2010 ...