![Oxford Instruments OpAL Скачать руководство пользователя страница 217](http://html.mh-extra.com/html/oxford-instruments/opal/opal_system-manual_1664943217.webp)
System Manual
lñÑçêÇ=fåëíêìãÉåíë=mä~ëã~=qÉÅÜåçäçÖó==
lé^i
WARNING
BEFORE PROCEEDING WITH ANY MAINTENANCE WORK, READ SECTION 1 - HEALTH AND SAFETY
.
5)
The process chamber should be vented with dry nitrogen and the process gas inlet
blanked.
6)
Ensure that the system has been shut down in accordance with the procedure given in
Section 5 (Operating Instructions).
7)
Depending on system type, ensure that the front panel compressed air lockout valves are
set to their OFF positions and padlocked. (e.g.gate valves, RGA, etc. if fitted)
VKOKP
aáëÅçååÉÅíáåÖ=íÜÉ=ëÉêîáÅÉë==
IMPORTANT: BEFORE DISCONNECTING ANY OF THE SERVICES, ENSURE THAT THEY ARE TURNED
OFF. E.G. COMPRESSED AIR AND GAS SUPPLY VALVES SET TO THEIR OFF
POSITIONS AND ELECTRICAL SUPPLIES SWITCHED OFF AND LOCKED OUT.
1)
Ensure that all covers and panels are fitted and attach notices to the system indicating
that the system is not ready for service.
2)
Disconnect the electrical supply from the PC.
3)
Disconnect the electrical supply from the safety isolation box to the system console.
4)
At the system PC, disconnect the monitor, keyboard and mouse, then disconnect the
control cable(s) from the PC to the system console.
5)
Disconnect the safety earth (ground) between the system and the gas pod, if the gas pod
is not bonded to the system.
6)
Disconnect the cooling circuits from the system console. Coolant may be removed, if so
wished by using low pressure (< 1 bar gauge) compressed air. Do not seal the cooling
circuits tightly.
7)
Disconnect the gas outlet line(s) and control cable from the gas pod to the system
services panel.
8)
Disconnect the precursor source pots and cap the inlet and outlet ports
9)
Disconnect the gas supplies to the internal and external gas pod (all gas supply valves
closed).
10)
Disconnect the compressed air supply from the system services panel(s) and from the gas
pod.
11)
Disconnect the Nitrogen purge lines to the system services panel(s) and the rotary vane
pump(s).
12)
Disconnect the rotary pump(s) from the system and cap the pump ports and the system
vacuum ports.
13)
Disconnect the rotary vane pump exhaust line.
14)
Disconnect the extraction collars on the process chamber(s) (e.g. ICP process chambers)
and the gas pod from the extraction systems.
Uninstallation and Disposal
Printed: 7-Oct-07, 12:11
Page 9-3 of 6
Issue 1: February 00
Содержание OpAL
Страница 14: ......
Страница 229: ...OpAL Open Load Atomic Layer Thermal Deposition System Installation Data Typical OpAL thermal system Issue 3 October ...
Страница 299: ...bèìáéãÉåí j åì ä ää lfmq póëíÉãë RF Automatic Matching Unit Issue 6 September 2005 Page 1 of 20 ...
Страница 319: ...ALD Ozone Delivery System Ozone Delivery System for FlexAL and OpAL Systems Equipment Manual Issue 1 July 2010 ...