1.4.6.2
Ensure that effluents are extracted into a safe disposal system. The bore of the
extraction pipework must be of a greater internal bore than the pump outlet. Exhaust
lines carrying hazardous gases must not be used for any other purpose.
turbomolecular pumps MUST always be nitrogen ballasted, if this feature is
on any of these
ure safe operation, they must be installed and regularly maintained.
1.4.6.4
If no local guidelines are available, the regulations contained in U.S. documents UBC
try’
m BCGA or ECIF.
.4.6.6
a 100mm diameter extraction collar. If toxic,
s lines to reduce the risk of
.4.6.10
.4.6.12 Where gas detectors are fitted, their responses should be verified every two weeks
(refer to the manufacturer's manuals).
1.4.6.13 Compressed gases can penetrate the skin and enter the blood stream. Avoid direct
contact with compressed gases.
1.4.6.3
Rotary and
provided on the system. For Plasmalab deposition systems, the oil box of the rotary
pump should also be purged. If a flow switch and alarm are needed
lines to ens
If toxic, flammable or corrosive gases are to be used, the entire system must be installed
in accordance with best practice for the semiconductor production industry.
9.911 (1985) and UFC 51 are recommended reading. Guidance is also contained in
‘The Safe Storage, Handling and Use of Liquid Gases in the Micro-Electronics Indus
COP CP18, ISBN 0260 - 4809, available fro
BCGA/ECIF
1.4.6.5
If toxic, flammable or corrosive gases are to be used, the entire system must be situated
in a purged or extracted environment with suitable gas detectors.
Gas pods supplied by OIPT incorporate
1
flammable or corrosive gases are used, extraction facilities must be connected to this
collar. Purge gas extracted from the gas pod should be monitored by a suitable gas
detector to give advance warning of any leakage.
1.4.6.7
Ensure that the purge gas extraction system can withstand corrosion or combustion if
necessary.
1.4.6.8
Make regular checks on the vacuum integrity of the ga
sudden leaks.
1.4.6.9
Ensure that the system is completely purged BEFORE maintenance is started and
suitably leak tested AFTER maintenance is completed.
1
As far as practicable, shut down gas lines when not in use.
1.4.6.11 Pumps must always be operated in accordance with the manufacturers' manuals and
with Oxford Instruments Plasma Technology engineers' training courses.
Pumps, when fitted with a nitrogen purging facility, must always be purged during a
processing run and for a suitable period after a processing run has finished.
1
Содержание OpAL
Страница 14: ......
Страница 229: ...OpAL Open Load Atomic Layer Thermal Deposition System Installation Data Typical OpAL thermal system Issue 3 October ...
Страница 299: ...bèìáéãÉåí j åì ä ää lfmq póëíÉãë RF Automatic Matching Unit Issue 6 September 2005 Page 1 of 20 ...
Страница 319: ...ALD Ozone Delivery System Ozone Delivery System for FlexAL and OpAL Systems Equipment Manual Issue 1 July 2010 ...