14
Installation
Section 2-1
Mounting to DIN Rail
• Mount the EJ1G to DIN Rail.
• Use screws to secure the DIN Rail in at least 3 locations.
• Install the DIN Rail vertically to the ground.
Installation Method
Pull down the hooks on the bottoms of the Units, and then catch the hooks on
the tops of the Units onto the DIN Rail and press the Units onto the DIN Rail
until they lock into place.
Removal Method
Pull down on the hooks with a flat-blade screwdriver and lift up on the Units.
DIN Rail: PFP-50N (50 cm) or PFP-100N (100 cm)
Vertical: OK
Horizontal: NG
4. Make sure the Units are
locked into place.
2. Catch the upper hooks onto the DIN Rail.
3. Press in on the Units.
1. Pull down the hooks.
0.
4
2.
5
Flat-blade screwdriver
Flat-blade screwdriver
(unit: mm)
Содержание EJ1G
Страница 1: ...USER S MANUAL Modular Temperature Controllers for Gradient Temperature Control EJ1G Cat No H143 E1 01 ...
Страница 3: ...iv ...
Страница 17: ...xviii ...
Страница 21: ...xxii ...
Страница 53: ...32 Unit Configuration Examples Section 2 4 ...
Страница 69: ...48 Changing SPs During Operation Section 3 3 ...
Страница 81: ...60 Other Functions Section 4 5 ...
Страница 145: ...124 Other HFU Functions Section 5 7 ...
Страница 167: ...146 Detailed Description of Services Section 6 4 ...
Страница 189: ...168 Determining the Error from the Current Situation for Heater Burnout Alarm Errors Section 7 8 ...
Страница 229: ...208 Parameters That Can Be Allocated for Programless Communications Appendix ...
Страница 237: ......