6 - 30
LLE11ARDA001A/E
6.29 Replacing the Miter Gear
Replacement part: 40350-M392
1. Remove the processing AS (40350-3300).
(See 6.11.)
2. Unscrew HH3×3 (n=2) and remove the miter
gear (40350-M392).
3. Reassemble the parts in reverse order.
* Attach the miter gear (40350-M392) so that
the flat surfaces of the shaft (40350-M391)
fit the position of HH3×3. In addition, attach
it so that there is no clearance between the
spacer (40350-M396) and the miter gear
(40350-M392).
4. Apply grease (Nippeco) to the tooth of the
miter gear (40350-M392).
5. Clean the processing AS (40350-3300) and
attach it as it was. When the miter gear inside
of the processing AS is worn, replace the
processing AS (40350-3300) with a new one
as well.
(See 6.11.)
* Perform the mesh adjustment of the miter gear
(40350-M392).
6.30 Replacing the End Mill
Replacement part: 40350-M372
1. Press MENU on the layout screen.
2. Press Maintenance to display the pop-up
menu.
3. Press DONE for the Drill Exchange to display
the pop-up menu.
4. Press YES in the pop-up menu.
5. The chuck lowers and the spindle moves
toward the front.
6. Turn off the power once. Fix the G nut (40350-
M369) with a spanner. Turn the nut (40350-
M368) in the arrow mark direction as
illustrated on the right to loosen it, and
remove the end mill (40350-M372).
7. Reassemble the parts in reverse order.
* Check the depth of the hole after turning on
the power.
**
Flat surface
Flat surface
Содержание ME-1000
Страница 8: ...1 2 LLE11ARDA001A E...
Страница 12: ...3 2 LLE11ARDA001A E...
Страница 120: ...7 34 LLE11ARDA001A E...
Страница 121: ...8 1 LLE11ARDA001A E 8 SUPPLEMENT 8 1 Wiring Diagram...
Страница 122: ...8 2 LLE11ARDA001A E 8 2 Connector Cable...
Страница 123: ...8 3 LLE11ARDA001A E...
Страница 125: ...8 5 LLE11ARDA001A E 8 4 Labels Top view Processing chamber...
Страница 126: ...8 6 LLE11ARDA001A E Rear view or...