Chapter 5: Installation
Analog Fallback System [Europe Only]
Page 5-86
Inter-Tel
®
5000 Installation Manual – Issue 2.4, May 2008
Figure 5-50.
Fallback Connections
Fallback operation can be tested by removing the line cord from the CPU. This will force all
fallback circuits to operate and may disconnect any calls on these circuits.
Dedicated Connections
System Connections
To PSTN
To LSM-2/4
To Dedicated
Fallback Endpoint
PSTN
COU
F/B
J20
Connectors
To PSTN
To LSM-2/4
PSTN
COU
F/B
PSTN
COU
F/B
To
Endpoint
To SL Ports
in chassis
J20
Connectors
J20
Connectors
Содержание Inter-Tel 5000
Страница 1: ...Inter Tel 5000 M I T E L Installation and Maintenance Manual ...
Страница 2: ......
Страница 3: ...Issue 2 4 May 2008 Inter Tel 5000 Installation and Maintenance Manual Part Number 580 8000 ...
Страница 4: ......
Страница 6: ......
Страница 20: ......
Страница 62: ......
Страница 366: ......
Страница 432: ......
Страница 467: ......
Страница 468: ...Part No 580 8000 Issue 2 4 May 2008 A691 9111A ...