5-55
7. Check the APL valve, support tube on the median plate, and sealing components of the
bag/mechanical ventilation switch assembly
The test requires a T-shaped Allen wrench.
Test procedures:
(
1
)
Turn off the system switch.
(
2
)
Remove the APL valve. Check all seals and replace the defective ones.
(
3
)
Remove the support tube on the median plate. Check the seals and replace the
defective one.
(
4
)
Remove the bag/mechanical ventilation switch. Check the seals and replace the
defective one.
8. Check the ACGO assembly
Tools required:
Negative pressure ball (quantity: 1)
Circuit adapter test fixture (quantity: 1)
PU tube (6X100) (quantity: 1)
3106-08-10 adapter connector (quantity: 2)
3126-06-00 tube plug (quantity: 1)
3126-08-00 tube plug (quantity: 1)
3126-10-00 tube plug (quantity: 2)
Test procedures:
(
1
)
Turn off the system switch.
(
2
)
Pull out No.21 and 22 PU tubes which connect the ACGO assembly to the circuit
adapter assembly. The ends of the tubes which connect the ACGO assembly are pulled
out but the other ends are not, as shown below.
Seal to be checked
Содержание WATO EX-55
Страница 1: ...WATO EX 55 65 Anesthesia Machine Service Manual ...
Страница 2: ......
Страница 4: ...II FOR YOUR NOTES ...
Страница 6: ...IV FOR YOUR NOTES ...
Страница 12: ...6 FOR YOUR NOTES ...
Страница 18: ...2 2 2 2 Gas Flow 2 2 1 Pneumatic Circuit Diagram vaporizer vaporizer Patient Waste gas disposal Patient Air ...
Страница 58: ...3 22 FOR YOUR NOTES ...
Страница 133: ...5 13 Negative pressure ball Circuit adapter test fixture Flow sensor pressure sampling pipeline test fixture ...
Страница 134: ...5 14 Vaporizer manifold test fixture Anesthesia machine calibration device 1 MPa 10bar test pressure gauge ...
Страница 242: ...6 54 6 4 1 Electrical Connections Electrical Circuit Diagram ...
Страница 260: ...6 72 FOR YOUR NOTES ...
Страница 261: ...7 1 7 Parts 7 1 Main Unit 7 1 1 Main Unit 7 1 1 1 Exploded View ...
Страница 321: ......
Страница 322: ...P N 0621 20 78654 1 1 ...