6-8
6.2.6 Remove the Throttling Device
1. Follow the steps described in
6.2.5Remove the Left Front Panel Assembly.
2. Disconnect the gas-in tube, gas-out tube and pressure sampling tube.
3. Open the cable ties and disconnect the connection lines from the flowmeter control
board. Unscrew the fixed screws.
Gas-in tube
Gas-out tube
Pressure sampling tube
Remove the
connection lines
Open the cable ties
Fixed screws
Содержание WATO EX-55
Страница 1: ...WATO EX 55 65 Anesthesia Machine Service Manual ...
Страница 2: ......
Страница 4: ...II FOR YOUR NOTES ...
Страница 6: ...IV FOR YOUR NOTES ...
Страница 12: ...6 FOR YOUR NOTES ...
Страница 18: ...2 2 2 2 Gas Flow 2 2 1 Pneumatic Circuit Diagram vaporizer vaporizer Patient Waste gas disposal Patient Air ...
Страница 58: ...3 22 FOR YOUR NOTES ...
Страница 133: ...5 13 Negative pressure ball Circuit adapter test fixture Flow sensor pressure sampling pipeline test fixture ...
Страница 134: ...5 14 Vaporizer manifold test fixture Anesthesia machine calibration device 1 MPa 10bar test pressure gauge ...
Страница 242: ...6 54 6 4 1 Electrical Connections Electrical Circuit Diagram ...
Страница 260: ...6 72 FOR YOUR NOTES ...
Страница 261: ...7 1 7 Parts 7 1 Main Unit 7 1 1 Main Unit 7 1 1 1 Exploded View ...
Страница 321: ......
Страница 322: ...P N 0621 20 78654 1 1 ...