6-3
6.1.3 Bleed Gas Pressure
Make sure to bleed the gas pressure inside the anesthesia machine before disassembling
pneumatic fittings to avoid personal injury or equipment damage. To bleed gas pressure:
1. Close other cylinder valves and disconnect pipeline gas supplies. Do not disconnect
the O2 pipeline. If O2 pipeline is not available, connect O2 cylinder and open the O2
cylinder valve.
2. Set the system switch to ON.
3. Turn on all the flow controls (except O2).
4. Make sure that N2O and AIR pipeline pressure gauges read zero.
5. Disconnect the O2 pipeline supply (or close the O2 cylinder valve). Push the O2 flush
button to bleed O2 from the system.
6. Set the system switch to OFF.
6.2 Disassemble the Assemblies
6.2.1 Remove the Top Panel
1. Pry up the screw plugs and unscrew the eight screws as shown below.
Содержание WATO EX-55
Страница 1: ...WATO EX 55 65 Anesthesia Machine Service Manual ...
Страница 2: ......
Страница 4: ...II FOR YOUR NOTES ...
Страница 6: ...IV FOR YOUR NOTES ...
Страница 12: ...6 FOR YOUR NOTES ...
Страница 18: ...2 2 2 2 Gas Flow 2 2 1 Pneumatic Circuit Diagram vaporizer vaporizer Patient Waste gas disposal Patient Air ...
Страница 58: ...3 22 FOR YOUR NOTES ...
Страница 133: ...5 13 Negative pressure ball Circuit adapter test fixture Flow sensor pressure sampling pipeline test fixture ...
Страница 134: ...5 14 Vaporizer manifold test fixture Anesthesia machine calibration device 1 MPa 10bar test pressure gauge ...
Страница 242: ...6 54 6 4 1 Electrical Connections Electrical Circuit Diagram ...
Страница 260: ...6 72 FOR YOUR NOTES ...
Страница 261: ...7 1 7 Parts 7 1 Main Unit 7 1 1 Main Unit 7 1 1 1 Exploded View ...
Страница 321: ......
Страница 322: ...P N 0621 20 78654 1 1 ...