Installation and Maintenance
3-2
3.1
Installation
WARNING
z
The installation of the monitor must be carried out by personnel
authorized by Mindray. The software copyright of the monitor is solely
owned by our company. Any action to change, copy or exchange the
software copyright by any organization or person is regarded as
copyright infringement and is not allowed.
3.1.1
Unpacking and Checking
Before unpacking, examine the packing case carefully for signs of damage. If any
damage is detected, contact the carrier or our company.
If the packing case is intact, open the package and remove the instrument and
accessories carefully. Check all materials against the packing list and check for any
mechanical damage. Contact our Customer Service Department for in case of any
problem.
NOTE
z
Please save the packing case and packaging material for future
transport and storage.
WARNING
z
Be sure to keep the packaging materials from children’s reach.
z
Disposal of the packaging materials shall comply with your local
requirements.
z
The equipment might be contaminated in storage, transport or when
used. Verify the package and the single use accessories are intact. In
case of any damage, do not apply it to patients.
Содержание PM-9000
Страница 1: ...PM 9000 Patient Monitor Operation Manual...
Страница 2: ......
Страница 14: ...Contents XII FOR YOUR NOTES...
Страница 42: ...The Basics 2 18 FOR YOUR NOTES...
Страница 54: ...Installation and Maintenance 3 12 FOR YOUR NOTES...
Страница 106: ...Alarms 6 12 FOR YOUR NOTES...
Страница 111: ...8 1 8 Recording 8 1 Overview 8 2 8 2 Recording Types 8 2 8 3 Recorder Operations 8 5 8 4 Installing Recorder Paper 8 9...
Страница 131: ...10 1 10 Drug Calculation 10 1 Drug Calculation 10 2 10 2 Titration Table 10 5...
Страница 184: ...ECG RESP Monitoring 11 48 FOR YOUR NOTES...
Страница 216: ...SpO2 Monitoring 12 32 FOR YOUR NOTES...
Страница 276: ...CO Monitoring 16 14 FOR YOUR NOTES...
Страница 377: ......
Страница 378: ...P N 9100 20 11311 6 2...