Chapter 6 Basic usage
6-11
2
2
2
6
3
(Left screen) Select the job to be imported.
• Move to the folder that contains the job you want to import and press and hold the job to select.
4
(Right screen) Specify the import destination.
• Move to the folder where you want to copy the job.
Click [ADD NEW FOLDER] to pop up <Create folder> dialog.
Enter the folder name on the screen and tap the [Enter] key to create a folder with the entered name and close the
<Create folder> dialog.
[ADD NEW FOLDER]
button
Specifying the import
destination
Содержание ML Tiger-1800B MKII
Страница 3: ...ii 1 2 2 4 5 6 ...
Страница 6: ...v Troubleshooting 9 5 Dismantling 9 27 ...
Страница 25: ...Chapter 1 Introduction 1 19 1 2 3 4 5 6 M915601 PC outlet rated label ...
Страница 26: ...Chapter 1 Introduction 1 20 ...
Страница 38: ...2 12 Chapter 2 Outline explanation ...
Страница 50: ...4 10 Chapter 4 Installation ...
Страница 120: ...Chapter 6 Basic usage 6 66 ...
Страница 140: ...Chapter 7 Operation Adjustment and Maintenance 7 20 ...
Страница 174: ... MIMAKI ENGINEERING CO LTD 2020 IG MM Tiger Products Install Pack 2 04 ...