4-6
Chapter 4 Installation
Confirmation of damage
Damage described in this section refers to damage that may occur at all stages (storage, transportation, etc.) before
installation.
As soon as you receive this machine, please check whether parts are damaged or missing.
If damage occurs to this machine or accessories are lost, contact Mimaki's Assembly Director promptly.
Thoroughly examine the box and package before taking out the contents from the packaging, such as the parts of this
machine. This is because multiple accessories and individual parts may be protected with the same packaging.
In particular, check whether the various parts are not physically damaged due to the impact, especially the following
points.
• There is no indentation or breakage in the protective guard. If there is no indentation or damage, remove the part and
check that the protected part is not damaged.
• All units of this machine are not damaged.
• There is no trace of rust on the unpainted parts.
• There are no traces of crushing or breakage in all external wiring between the electrical box and various maintenance
parts (motors, limit switches, etc.).
• There are no signs of damage in the guides of various units.
Before transporting this machine to the installation site, make sure that the installation site itself is clean, that no other
material or equipment is placed on the entire floor surface necessary for handling the machine, and that the transport
route is clear.
• If there is damage, stop the installation work immediately, tell the responsible person of this machine the
state of damage, or contact Mimaki if necessary.
Содержание ML Tiger-1800B MKII
Страница 3: ...ii 1 2 2 4 5 6 ...
Страница 6: ...v Troubleshooting 9 5 Dismantling 9 27 ...
Страница 25: ...Chapter 1 Introduction 1 19 1 2 3 4 5 6 M915601 PC outlet rated label ...
Страница 26: ...Chapter 1 Introduction 1 20 ...
Страница 38: ...2 12 Chapter 2 Outline explanation ...
Страница 50: ...4 10 Chapter 4 Installation ...
Страница 120: ...Chapter 6 Basic usage 6 66 ...
Страница 140: ...Chapter 7 Operation Adjustment and Maintenance 7 20 ...
Страница 174: ... MIMAKI ENGINEERING CO LTD 2020 IG MM Tiger Products Install Pack 2 04 ...