![Micromass Quattro Ultima Скачать руководство пользователя страница 33](http://html1.mh-extra.com/html/micromass/quattro-ultima/quattro-ultima_user-manual_1787371033.webp)
Routine Procedures
Start Up Following a Complete Shutdown
Preparation
If the instrument has been unused for a lengthy period of time, proceed as follows:
Check the level of oil in
the rotary pump sight
glass. Refill or replenish as
necessary as described in
the pump manufacturer’s
literature.
Connect a supply of dry,
high purity nitrogen to the
connector on the service
panel at the rear of the
instrument. Adjust the
outlet pressure to 7 bar
(100 psi).
Connect a supply of argon
to the
CID Gas
connector on the service panel at the rear of the instrument.
Adjust the outlet pressure to approximately 350 mbar (5 psi).
Connect the water supply to the connections at the rear of the instrument.
Routine Procedures
Page 33
Quattro Ultima
User's Guide
Gas
Ballast
Drain
Plug
Exhaust
Filler
Plug
Oil Level
Indicator
Oil Mist
Filter
ESD
EARTH
FACILITY
OUTLET
INLET
10 AMP (T)
10 AMP (T)
NITROGEN GAS
WATER
CID
GAS
ROTARY PUMP
CONTROL
ROTARY PUMP
CONTROL
OUT
IN
1
0
Nitrogen
Gas In
CID Gas
Water
Connections
Содержание Quattro Ultima
Страница 2: ...Quattro Ultima User s Guide...
Страница 68: ......
Страница 100: ...Data Acquisition Page 100 Quattro Ultima User s Guide...
Страница 117: ...Mass Calibration Page 117 Quattro Ultima User s Guide...
Страница 140: ...Mass Calibration Page 140 Quattro Ultima User s Guide...
Страница 212: ...Maintenance and Fault Finding Page 212 Quattro Ultima User s Guide...
Страница 222: ...Reference Information Page 222 Quattro Ultima User s Guide...