Power Network Application Trainer
– Earthing / Grounding network impedance measurement
46
2.2.1 Wenner method measurement
Four earth probes are placed on a straight line, at a distance “a” from one another and
at depth b < a/20. Distance “a” must be between 0,1 m and 29,9 m.
Figure 26-2: Wenner method for specific earth resistance measurements
Specific earth resistance according to Wenner method:
where:
R
e
....................................... Measured earth resistance in 4-pole method
a ......................................... Distance between earth probes
b ......................................... Depth of earth probes
π ......................................... Number π is a mathematical constant (3.1416)
2.2.2 Schlumberger method measurement
ES and S earth probes are located at a distance “d” from one another and other two
earth probes (E and H) at distance “a” from ES and S probes (see Figure 13-3 below).
All probes must be placed on a straight line and to a depth of “b”, considering the
condition b << a and d. Distance “d” must be between 0,1 m and 29,9 m and the
distance “a” must be a>2*d.
Figure 27-2: Schlumberger method for specific earth resistance measurements
Содержание MI 3298
Страница 55: ...Power Network Application Trainer Earthing Grounding network impedance measurement 55 ...
Страница 56: ...Power Network Application Trainer Earthing Grounding network impedance measurement 56 ...
Страница 124: ...Power Network Application Trainer Earthing Grounding network impedance measurement 124 ...
Страница 228: ...MI 3290 Earth Analyser 228 ...
Страница 229: ...MI 3280 Digital Transformer Analyser 229 ...
Страница 230: ...MI 3280 Digital Transformer Analyser 230 ...
Страница 231: ...MI 3250 MicroOhm 10A 231 ...
Страница 232: ...MI 3205 TeraOhmXA 5kV 232 ...