Note:
For the complex tested objects, the GUARD terminal should be connected.
Example; insulation resistance measurement without connected GROUNG terminal,
where is great deviation of the result.
Note:
You need to connect all terminals on each side of the transformer together; otherwise
you need to check each combination (U-u, U-v, U-w; V-u, V-v, V-w; W-u, W-v, W-w).
Exercise 1.2: Step voltage test
between primary and secondary side of transformer
Measuring procedure
1. Under
MAIM MENU
MEASUREMENTS
menu select
Step Voltage Test
measurement function
4. Set the parameters by clicking the bottom left dark grey corner
Un
Set test voltage
– step 50 V (50 V – 1 kV) and 100 V (1 kV – 10 kV) –
final value.
Maximum test voltage is 1 kV!
Timer1
Duration of measurement (mm:ss)
– step 1 s (max time 99 min) – total
Содержание MI 3298
Страница 55: ...Power Network Application Trainer Earthing Grounding network impedance measurement 55 ...
Страница 56: ...Power Network Application Trainer Earthing Grounding network impedance measurement 56 ...
Страница 124: ...Power Network Application Trainer Earthing Grounding network impedance measurement 124 ...
Страница 228: ...MI 3290 Earth Analyser 228 ...
Страница 229: ...MI 3280 Digital Transformer Analyser 229 ...
Страница 230: ...MI 3280 Digital Transformer Analyser 230 ...
Страница 231: ...MI 3250 MicroOhm 10A 231 ...
Страница 232: ...MI 3205 TeraOhmXA 5kV 232 ...