Measuring procedure:
1. Select proper switch position on the training module:
2. Under
Test
function select the
PGWT
measurement method
3. Connect measuring cables according the connection diagram
- connect the black test probe to H (C1) and GUARD terminal and other part to
the
“current probe”
R
CE
- connect the blue test probe to E(C2) terminal and other part to the
pylon
- fit the S-Flex clamp around
all four foots
Note: Current for all tower foots have to be measured!
4. Setup the parameters, test frequency and number of turnings
5. Start the measurement by pressing START key
on the instrument or icon
on the LCD
Содержание MI 3298
Страница 55: ...Power Network Application Trainer Earthing Grounding network impedance measurement 55 ...
Страница 56: ...Power Network Application Trainer Earthing Grounding network impedance measurement 56 ...
Страница 124: ...Power Network Application Trainer Earthing Grounding network impedance measurement 124 ...
Страница 228: ...MI 3290 Earth Analyser 228 ...
Страница 229: ...MI 3280 Digital Transformer Analyser 229 ...
Страница 230: ...MI 3280 Digital Transformer Analyser 230 ...
Страница 231: ...MI 3250 MicroOhm 10A 231 ...
Страница 232: ...MI 3205 TeraOhmXA 5kV 232 ...